Attachment of ties
The ties are attached to the building by bolts, washers and nuts
into the holes which are drilled at the installation or embedment
sets or other approved suitable wall bracket attachments.
Cast in place inserts must be installed prior to the hoist
installation in order for the concrete to cure properly and reach
its proper strength. Concrete must be of suitable strength for
calculated loads (See Reaction forces). Care must be taken in
locating the inserts at their proper location (See type of mast tie).
If other type of bolt is used such as epoxy cast in bolt or
expansion bolt, it is important to choose an approved type
which can take the calculated force in this application with a
satisfactory safety factor.
Specifications for this type of attachment should follow the
manufacturer’s recommendations and be approved by the
governing authority for their use.
ALIMAK 34811 - 1/01
H
20
Wall bracket
Reinforcement
h 16
Wall bracket P/N 9100631-000
Hole dia. 26 mm for bolt dimension M24
c/c between bolts 350 mm ( 1’- 1 3/4’’)
Wall bracket P/N 9101019-000
Hole dia. 26 mm for bolt dimension M24
c/c between bolts 890 mm ( 2’- 11’’).
Height between hole rows = 110 mm (4 1/4’’).
Содержание Scando 650 DOL
Страница 4: ......
Страница 6: ...2 8 m car base structure 9 2 1 4 3 5 m car base structure 11 5 3 4 ...
Страница 16: ...A10 ...
Страница 32: ......
Страница 38: ...B5 ...
Страница 92: ......
Страница 94: ......
Страница 106: ......
Страница 108: ......
Страница 116: ...H8 ...
Страница 132: ......
Страница 134: ......
Страница 140: ......
Страница 141: ...HOIST capacity 2400 kg or 24 passengers 9101286 101 ...
Страница 142: ......
Страница 144: ......