6 Installation
Contherm
™
HEAD ORIENTATION and Equipment Drainability in Horizontal Installations
To maintain a dry bearing area, the Contherm
™
head and port orientation should be kept in the configuration as demonstrated in
your project specific general arrangement drawing otherwise pooling of product, CIP solution or moisture can occur causing
premature bearing failure.
Figure 6-11. Head Port Location
1
Drive end (see below image of head orientation at outlet of Contherm
™
).
2
Outboard end (see below image of head orientation at inlet of Contherm
™
).
3
Adjustable leveling feet.
4
Pitch drive end up 0.5° toward outboard end for drainage using leveling feet.
Figure 6-13.
Head Port Location
37
Содержание Contherm 6X11
Страница 2: ......
Страница 10: ...2 Safety Summary Figure 2 1B Safety Warnings Refer to section 2 3 for safety and inspection symbols 10...
Страница 52: ...7 Operations Figure 7 2A Installing the Rotor Helper Plate Figure 7 2A Installing the Rotor Helper Plate 52...
Страница 66: ...8 Inspection Maintenance Figure 8 2 Component List Figure 8 2 66...
Страница 88: ...8 Inspection Maintenance Figure 8 13 Upper Bearings Direct Coupled Electric Drive Motor 88...
Страница 99: ...8 Inspection Maintenance Figure 8 18B CONTHERM Hydraulic Lift Assembly With Hold Down 99...
Страница 117: ...10 Appendix A Additional Installation Drawings 117...
Страница 118: ...10 Appendix A Additional Installation Drawings 10 Install the hydraulic lift pump and stack valve components 118...
Страница 123: ...123...