![Alamo Industrial A-Boom Скачать руководство пользователя страница 158](http://html1.mh-extra.com/html/alamo-industrial/a-boom/a-boom_operators-manual_2888363158.webp)
MAINTENANCE
ABOOM 03/09
Maintenance Section 4-14
©2009 Alamo Group Inc.
MAINTENANCE
Flail Axe Head
Belt Tension:
When installing new belts, tighten belts to obtain a 16 lb. Belt Deflec tor Force at 7/16" deflection. Af ter a few
hours of operation to allow the belts to seat into the sheave grooves recheck and adjust as needed to obtain an
8 to 1 2 lb. Be lt D eflection F orce at 7 /16" deflection. I nspect belts and recheck b elt t ension periodically to
maintain an 8 to 12 lb. Belt Deflection Force at 7/16" deflection.
TAPER BUSHING & SHEAVE INSTALLATION
Do not use lubricants during installation as this may cause sheave breakage.
Make sure the bushing and bore of the sheave are free of dirt, paint, metal chips, etc.
Insert cap screws and lockwashers engaging only 2 or 3 threads.
With key in the keyway, slide the loosely assembled unit onto the shaft and position for good belt alignment.
Temporary shimming under the pulley may make it easier to position.
Carefully tighten cap screws alternately and progressively until tapers are seated (about 5 FT-LB).
Check sheave alignment and runout (wobble).
Continue careful alternate and progressive tightening of cap screws to 10 FT-LB.
Maximum torque should be achieved on each individual bolt only two times.
Содержание A-Boom
Страница 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Страница 41: ...SAFETY A BOOM 03 09 Safety Section 1 35 2009 Alamo Group Inc SAFETY Multi Hazard Decal Sheet P N 00749117...
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...Introduction Section 2 1 2009Alamo Group Inc INTRODUCTION SECTION...
Страница 97: ...Operation Section 3 1 2009 Alamo Group Inc OPERATION SECTION...
Страница 145: ...Maintenance Section 4 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Страница 161: ......
Страница 164: ...ABOOM SOM 03 09 P N 02924700C Printed U S A...