![Alamo Industrial A-Boom Скачать руководство пользователя страница 137](http://html1.mh-extra.com/html/alamo-industrial/a-boom/a-boom_operators-manual_2888363137.webp)
OPERATION
A-BOOM 03/09
Operation Section 3-41
©2009 Alamo Group Inc.
OPERA
TION
Sickle Bar
•
The Sickle Bar Cutter will cut a 5’ swath
through tough weeds and grass.
•
The Sickle Bar Cutter is operated attached to
the boom arm and is ideal for vegetation
maintenance
•
When operating the Sickle Bar correctly it will
give you a fast, efficient, and cost-effective
method of vegetation maintenance.
•
The Sickle Bar will also cut vegetation through
tough weeds under water, ideal for maintaining
ponds, creeks, and other areas that may be
under shallow water.
•
When operating the unit be sure there are no
bystanders or animals within 100 yards of the
unit
.
OPS-B- 0049
The rotating parts of this machine have been designed and tested for rugged use.
However, the blades could fail upon impact with heavy, solid objects such as metal guard
rails and concrete structures. Such impact could cause the broken objects to be thrown
outward at very high veloc ities. To reduce the possibility of property damage, serious
injury, or even death, never allow the cutting blades to contact such obstacles.
(SGM-4)
Содержание A-Boom
Страница 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Страница 41: ...SAFETY A BOOM 03 09 Safety Section 1 35 2009 Alamo Group Inc SAFETY Multi Hazard Decal Sheet P N 00749117...
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...Introduction Section 2 1 2009Alamo Group Inc INTRODUCTION SECTION...
Страница 97: ...Operation Section 3 1 2009 Alamo Group Inc OPERATION SECTION...
Страница 145: ...Maintenance Section 4 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Страница 161: ......
Страница 164: ...ABOOM SOM 03 09 P N 02924700C Printed U S A...