![Alamo Industrial A-Boom Скачать руководство пользователя страница 121](http://html1.mh-extra.com/html/alamo-industrial/a-boom/a-boom_operators-manual_2888363121.webp)
OPERATION
A-BOOM 03/09
Operation Section 3-25
©2009 Alamo Group Inc.
OPERA
TION
For safe and efficient boom mower operation, it is critical that the operator be experienced and feel confident in
using the control valve sticks to position the boom. New operator’s should allowed ample time to practice using
the control valve sticks in an open area before entering the work site. Before attempting to operate this
equipment, read these instructions completely. If you have any questions concerning safety of operation,
contact your dealer or
ALAMO INDUSTRIAL
.
This valve is located on the Main Frame of the unit. These are fastened together in a bank of five valves. Their
use will be explained in the following pages of this manual. Read each explanation carefully then practice in a
safe, level area, CLEAR of all people, animals, and any obstructions. As always, use extreme caution when
using this machine. This valve is controlled by operating the Remote Control Valve Box mounted to the right of
the operator at a convenient height.
NOTE
: The stamped metal plate located above the control valve indicates each valve function.
Practice performing multiple functions simultaneously. With some practice, the control v alve sticks will
become very easy to operate and will feel almost as it were an extension of your arm.
With the exception of the relief valves, which are preset at the factory, these are all the controls for operating
the machine other than the controls on the tractor itself.
VALVE OPERATION PLATE P/N 02962024
Содержание A-Boom
Страница 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Страница 41: ...SAFETY A BOOM 03 09 Safety Section 1 35 2009 Alamo Group Inc SAFETY Multi Hazard Decal Sheet P N 00749117...
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...Introduction Section 2 1 2009Alamo Group Inc INTRODUCTION SECTION...
Страница 97: ...Operation Section 3 1 2009 Alamo Group Inc OPERATION SECTION...
Страница 145: ...Maintenance Section 4 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Страница 161: ......
Страница 164: ...ABOOM SOM 03 09 P N 02924700C Printed U S A...