![Alamo Industrial A-Boom Скачать руководство пользователя страница 125](http://html1.mh-extra.com/html/alamo-industrial/a-boom/a-boom_operators-manual_2888363125.webp)
OPERATION
A-BOOM 03/09
Operation Section 3-29
©2009 Alamo Group Inc.
OPERA
TION
9.2 Tilt
The fourth handle in the bank of four valves actuates the TILT cylinder. This valve, like the lift valve, has four
positions.
Pull the valve handle backward and you will cause the outer rim (farthest from the tr actor) to move UP until
the mower is cutting with the blade vertical, if you wish. This feature has been used successfully for trimming
hedges many feet away from the tractor.
If the handle is released, the valve will automatically return to center and the boom will be LOCKED in
position.
Pushing the handle forward will move the head in the opposite direction.
Again, if the handle is released, the valve will automatically return to center and the boom will be LOCKED in
position.
If the handle is pulled as far back as it will go, it will be LOCKED in the float position. This will allow the head
to pivot freely and follow the contour of the ground. If the mower head does not have wheels or rollers, the
mower head should be operated and controlled so that the head remains slightly above the ground surface
since it will not float on the skid shoes alone.
OPS-B- 0035_B
Содержание A-Boom
Страница 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Страница 41: ...SAFETY A BOOM 03 09 Safety Section 1 35 2009 Alamo Group Inc SAFETY Multi Hazard Decal Sheet P N 00749117...
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...Introduction Section 2 1 2009Alamo Group Inc INTRODUCTION SECTION...
Страница 97: ...Operation Section 3 1 2009 Alamo Group Inc OPERATION SECTION...
Страница 145: ...Maintenance Section 4 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Страница 161: ......
Страница 164: ...ABOOM SOM 03 09 P N 02924700C Printed U S A...