PCBRM100 User’s Guide
Chapter 1: Introduction/Overview
4101.00.902
1-8
1.3.3 Label Description and Placement
The following placards are affixed to the PCBRM100 system:
This label describes the electrical and air requirements for the system. The overall system requirements
can be found in the facilities section of this manual. It is located over the main disconnect switch on the
right side of the machine.
Air-Vac Engineering
Seymour, CT 06483 USA
Part No:
Serial No: Mfg Dt:
Power: V A ø Hz
Air: PSI
Содержание PCBRM100
Страница 1: ...PCBRM100...
Страница 2: ......
Страница 4: ...PCBRM100 User s Guide 4101 00 902...
Страница 6: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 2...
Страница 16: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 12...
Страница 17: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 13 Left Side...
Страница 18: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 14 Center Right Side...
Страница 19: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 15 Rear...
Страница 20: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 16...
Страница 22: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 18...
Страница 23: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 19 Left Side...
Страница 24: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 20 Center...
Страница 25: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 21...
Страница 26: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 22 Laser Warnings...
Страница 27: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 23 Front...
Страница 28: ...PCBRM100 User s Guide Chapter 1 Introduction Overview 4101 00 902 1 24 Rear...
Страница 30: ...PCBRM100 User s Guide Chapter 2 Facility Requirements 4101 00 902 2 2...
Страница 32: ...PCBRM100 User s Guide Chapter 2 Facility Requirements 4101 00 902 2 4...
Страница 33: ...PCBRM100 User s Guide Chapter 3 Start Up 4101 00 902 3 1 3 Start Up 3 Start Up 3...
Страница 34: ...PCBRM100 User s Guide Chapter 3 Start Up 4101 00 902 3 2...
Страница 38: ...PCBRM100 User s Guide Chapter 3 Start Up 4101 00 902 3 6...
Страница 40: ...PCBRM100 User s Guide Chapter 4 Software Overview 4101 00 902 4 2...
Страница 90: ...PCBRM100 User s Guide Chapter 4 Software Overview 4101 00 902 4 52 Adjustments...
Страница 96: ...PCBRM100 User s Guide Chapter 4 Software Overview 4101 00 902 4 58...
Страница 118: ...PCBRM100 User s Guide Chapter 4 Software Overview 4101 00 902 4 80...
Страница 120: ...PCBRM100 User s Guide Chapter 5 Process Development 4101 00 902 5 2...
Страница 141: ...PCBRM100 User s Guide Chapter 5 Process Development 4101 00 902 5 23 Event 15 Unload board Event 16 Park robot...
Страница 147: ...PCBRM100 User s Guide Chapter 5 Process Development 4101 00 902 5 29 After all above parameters are entered select Set...
Страница 158: ...PCBRM100 User s Guide Chapter 6 Maintenance 4101 00 902 6 2...
Страница 180: ...PCBRM100 User s Guide Chapter 6 Maintenance 4101 00 902 6 24...
Страница 182: ...PCBRM100 User s Guide Chapter 7 Error Messages 4101 00 902 7 2...