When connecting several boilers to
the same duct (i.e. types C43, C83
or cascades), make sure to install
an AIC-approved flue gas damper
on each boiler in the system.
î
If required by local regulations, install a
condensate neutralisation system. In that
case, it may be necessary to install the-
floor-standing boiler on a base to get suf-
ficient downward flow. If flow is not suffi-
cient, install a condensate pump.
i
The chimney system must be en-
gineered by a qualified profession-
al, according to local standards and
regulations. The overall installation
resistance of each boiler should not
exceed 200 Pa (including maximum
wind condition) measured at the out-
let of each boiler at maximum output.
Please contact your AIC representa-
tive for more information
Engineering the Chimney System
î
The flue system length must be cal-
culated so as to ensure a safe per-
formance of the system.
î
Make sure to install the boiler with the short-
est length of combustion air and flue ducts.
î
When several boilers need to be connected
to a common duct, please contact your AIC
representative for more information.
i
Combustion circuit
Open
Flue
Discharged to the outside
Combustion air
Drawn from the boiler room
Remark
Can be used for cascading
Combustion circuit
Open
Flue
Discharged to the outside
Combustion air
Drawn from the boiler room
Remark
Can be used for cascading
B
23
B
23
Make sure that the ventilation openings remain
unobstructed at all times.
Make sure that the ventilation
openings remain unobstructed at
all times.