![AIC N 280 FS Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/aic/n-280-fs/n-280-fs_installation-and-maintenance-manual_2870757003.webp)
G-3
B-070343_EN • B
I
ndex
of
I
llustratIons
Fig. 1. Boiler Packaged for Transport ...........................G-7
Fig. 2. Data Plate - Typical ..............................................G-7
Fig. 3. NESTA PLUS 280 - 420 Components - Top,
Front and Rear Views ..........................................G-9
Fig. 4. NESTA PLUS 570 - 840 Components - Front
View .................................................................... G-10
Fig. 5. NESTA PLUS 570 - 840 Components - Top
and Rear Views ................................................. G-11
Fig. 6. Control Panel ..................................................... G-12
Fig. 7. Typical Display ................................................... G-13
Fig. 8. NESTA PLUS 280 & 420 .................................. G-14
Fig. 9. NESTA PLUS 570 & 840 .................................. G-15
Fig. 10. NESTA PLUS clearances ................................ G-15
Fig. 11. Boiler transport and Installation .........................I-28
Fig. 12. Lifting the Boiler from the Top ............................I-29
Fig. 13. Components in their Storage Location .............I-30
Fig. 14. Bottom Front Panel - First Installation ...............I-30
Fig. 15. Air Inlet Installation ...............................................I-31
Fig. 16. Removing/Installing the Top, Front and Side
Access Panels ......................................................I-33
Fig. 17. Removing/Installing the rear Top and Bottom
Panels....................................................................I-33
Fig. 18. Typical Heating System ......................................I-36
Fig. 19. Cascaded Boilers, with External Domestic
Hot Water Tank and Plate Heat Exchanger ......I-37
Fig. 20. Cascaded Boilers, with External Domestic
Hot Water Tank and Low Loss Header .............I-38
Fig. 21. Accessing the Gas Valve ....................................I-41
Fig. 22. Gas Valve - Shutter Pre-adjustment for
Propane ...............................................................I-41
Fig. 23. Fan Speed Adjustment - Typical Screen ..........I-42
Fig. 24. Combustion Adjustment - Control Panel .........I-43
Fig. 25. Combustion Adjustment on Gas Valve ............I-43
Fig. 26. Accessing the High Voltage Terminal ................I-48
Fig. 27. Accessing the Low Voltage Terminals and
Electronic Board ..................................................I-49
Fig. 28. Routing the Electrical Cables .............................I-49
Fig. 29. Filling the System - Typical .................................I-52
Fig. 30. Gas Valve - Gas Shutter Location ....................I-53
Fig. 31. Draining the Boiler - Typical ................................I-56
Fig. 32. Removing and Installing the Electrodes ...........I-57
Fig. 33. Cleaning the Condensate Pipe and Trap..........I-59
Fig. 34. Replacing the Gas Valve Filter ...........................I-60
Fig. 35. Removing and Installing the Burner
(NESTA PLUS 280 - 420) ....................................I-61
Fig. 36. Removing and Installing the Burner
(NESTA PLUS 570 - 840) ....................................I-61
Fig. 37. Cleaning the Combustion Chamber .................I-62
Fig. 38. Extension Module and Cable hub .....................I-63
Fig. 39. Cascading Module ..............................................I-63
Fig. 40. Web Server Module.............................................I-63
Fig. 41. Principles of Cascade .........................................I-64
Fig. 42. Cascading Module ..............................................I-64
Fig. 43. Cascade System with Plate Heat Exchanger /
Low Loss Header ................................................I-65