background image

Installation Note N5230-90004                                                                                                                         

 

3

Contacting Agilent

Assistance with test and measurement needs and information on finding a local Agilent office 
are available on the Web at:

http://www.agilent.com/find/assist

If you do not have access to the Internet, please contact your Agilent field engineer.

NOTE

In any correspondence or telephone conversation, refer to the Agilent 
product by its model number and full serial number. With this 
information, the Agilent representative can determine whether your 
product is still within its warranty period.

Description of the Upgrade 

This upgrade converts your standard test set analyzer to a configurable test set analyzer by 
adding Option 014, Configurable Test Set and Option 1E1, Source Attenuators.

Option 014, Configurable Test Set adds the additional cabling necessary to allow your 
analyzer to perform measurements on high power devices and on devices with high dynamic 
range.

Option 1E1, Source Attenuators adds a 60-dB step attenuator in the signal path of each of the 
measurement ports. These attenuators are used to adjust the power level (in 10 dB steps) to 
the device under test (DUT) without changing the power in the reference path.

About Installing the Upgrade

Products affected . . . . . . . . . . . . . . . . . . . . . . . . . .N5230A/C; standard test set, 6 GHz, 2-port

N5230A/C; standard test set, 13.5 GHz, 2-
port

Installation to be performed by  . . . . . . . . . . . . . .Agilent service center or personnel 

qualified by Agilent

Estimated installation time . . . . . . . . . . . . . . . . . 2.0 hours 

Estimated adjustment time  . . . . . . . . . . . . . . . . . 0.5 hours

Estimated full instrument calibration time  . . . . 4.5 hours

Содержание N5230-60102

Страница 1: ...Printed in USA December 2007 Supersedes July 2007 Agilent Technologies Inc 2005 2007 Installation Note Configurable Test Set Upgrade Kit Upgrade Kit Number N5230 60102 For N5230A C Standard Test Set...

Страница 2: ...l item as defined in FAR 2 101 a or as Restricted computer software as defined in FAR 52 227 19 June 1987 or any equivalent agency regulation or contract clause Use duplication or disclosure of Softwa...

Страница 3: ...adding Option 014 Configurable Test Set and Option 1E1 Source Attenuators Option 014 Configurable Test Set adds the additional cabling necessary to allow your analyzer to perform measurements on high...

Страница 4: ...AM to A25 port 1 step attenuator 1 N5240 20023 W41 RF cable A19 SSLAM to A26 port 2 step attenuator 1 N5240 20024 W42 RF cable A25 port 1 step attenuator to PORT 1 SOURCE OUT 1 N5240 20021 W43 RF cabl...

Страница 5: ...d Static discharges too small to be felt can cause permanent damage To prevent damage to the instrument always have a grounded conductive table mat in front of your test equipment always wear a ground...

Страница 6: ...nnections except the front panel cable connectors Use a 5 16 in torque wrench set to 21 in lbs for these connections Equipment Required for Post Upgrade Adjustments Description Qty Part Number T 10 TO...

Страница 7: ...has not already been disconnected 2 With a T 20 TORX driver remove the strap handles item by loosening the screws item on both ends until the handle is free of the analyzer 3 With a T 20 TORX driver r...

Страница 8: ...m the analyzer lift and support the front of the analyzer chassis 2 Slide the front panel over the test port connectors 3 Disconnect the front panel interface ribbon cable item The front panel is now...

Страница 9: ...flat surface 2 Remove the following cables in the order listed W7 A19 SSLAM to A21 test port 1 coupler W9 A19 SSLAM R1 to A20 mixer brick R1 W11 A21 test port 1 coupler to A20 mixer brick A W8 A19 SSL...

Страница 10: ...nsert each screw only a few threads into the attenuator 2 Position the attenuators in the analyzer as shown by aligning the heads of the screws with the slotted holes in the side frame Make sure the a...

Страница 11: ...PORT 1 RCVR A IN to A20 mixer brick A W48 A21 test port 1 coupler to PORT 1 CPLR ARM W42 A25 port 1 step attenuator to PORT 1 SOURCE OUT W45 PORT 2 CPLR THRU to A22 test port 2 coupler W40 A19 SSLAM...

Страница 12: ...12 Installation Note N5230 90004 Figure 6 New Cable Installation...

Страница 13: ...scard it 3 Remove any adhesive remaining on the front panel 4 Remove the protective backing from the new front panel overlay item 5 Starting from either the left or right side loosely place the overla...

Страница 14: ...using a 5 16 in torque wrench set to 21 in lbs 2 Reconnect the ribbon cable item to the A3 front panel interface board 3 Slide the front panel over the test port connectors being careful to align the...

Страница 15: ...ont handles in the vertical position Do not place the analyzer on its front panel without the handles This will damage the front panel assemblies Refer to Figure 9 for this procedure 1 Slide the cover...

Страница 16: ...ble 3 In the Select Desired Option list click 1E1 Source Attenuators Click Enable 4 Click Yes in answer to the displayed question in the Restart Analyzer box 5 When the installation is complete click...

Страница 17: ...ound at Equipment Required for Post Upgrade Adjustments on page 6 Calibration The analyzer should now operate and phase lock over its entire frequency range If you experience difficulty with the basic...

Страница 18: ...18 Installation Note N5230 90004...

Отзывы: