background image

Installation Note N5230-90004                                                                                                                         

 

5

Installation Procedure for the Upgrade

The network analyzer must be in proper working condition prior to installing this option. Any 
necessary repairs must be made before proceeding with this installation.

WARNING

This installation requires the removal of the analyzer’s protective outer 
covers. The analyzer must be powered down and disconnected from the 
mains supply before performing this procedure.

Electrostatic Discharge Protection

Protection against electrostatic discharge (ESD) is essential while removing or connecting 
cables or assemblies within the network analyzer.

Static electricity can build up on your body and can easily damage sensitive internal circuit 
elements when discharged. Static discharges too small to be felt can cause permanent 
damage. To prevent damage to the instrument:

always

 have a grounded, conductive table mat in front of your test equipment.

always

 wear a grounded wrist strap, connected to a grounded conductive table mat, having 

a 1 M

Ω

 resistor in series with it, when handling components and assemblies or when 

making connections.

always

 wear a heel strap when working in an area with a conductive floor. If you are 

uncertain about the conductivity of your floor, wear a heel strap.

always

 ground yourself before you clean, inspect, or make a connection to a static-sensitive 

device or test port. You can, for example, grasp the grounded outer shell of the test port or 
cable connector briefly.

Figure 1

 shows a typical ESD protection setup using a grounded mat and wrist strap. Refer to 

“Tools and Equipment Required for the Installation” on page 6

 for part numbers.

Figure 1

ESD Protection Setup

Содержание N5230-60102

Страница 1: ...Printed in USA December 2007 Supersedes July 2007 Agilent Technologies Inc 2005 2007 Installation Note Configurable Test Set Upgrade Kit Upgrade Kit Number N5230 60102 For N5230A C Standard Test Set...

Страница 2: ...l item as defined in FAR 2 101 a or as Restricted computer software as defined in FAR 52 227 19 June 1987 or any equivalent agency regulation or contract clause Use duplication or disclosure of Softwa...

Страница 3: ...adding Option 014 Configurable Test Set and Option 1E1 Source Attenuators Option 014 Configurable Test Set adds the additional cabling necessary to allow your analyzer to perform measurements on high...

Страница 4: ...AM to A25 port 1 step attenuator 1 N5240 20023 W41 RF cable A19 SSLAM to A26 port 2 step attenuator 1 N5240 20024 W42 RF cable A25 port 1 step attenuator to PORT 1 SOURCE OUT 1 N5240 20021 W43 RF cabl...

Страница 5: ...d Static discharges too small to be felt can cause permanent damage To prevent damage to the instrument always have a grounded conductive table mat in front of your test equipment always wear a ground...

Страница 6: ...nnections except the front panel cable connectors Use a 5 16 in torque wrench set to 21 in lbs for these connections Equipment Required for Post Upgrade Adjustments Description Qty Part Number T 10 TO...

Страница 7: ...has not already been disconnected 2 With a T 20 TORX driver remove the strap handles item by loosening the screws item on both ends until the handle is free of the analyzer 3 With a T 20 TORX driver r...

Страница 8: ...m the analyzer lift and support the front of the analyzer chassis 2 Slide the front panel over the test port connectors 3 Disconnect the front panel interface ribbon cable item The front panel is now...

Страница 9: ...flat surface 2 Remove the following cables in the order listed W7 A19 SSLAM to A21 test port 1 coupler W9 A19 SSLAM R1 to A20 mixer brick R1 W11 A21 test port 1 coupler to A20 mixer brick A W8 A19 SSL...

Страница 10: ...nsert each screw only a few threads into the attenuator 2 Position the attenuators in the analyzer as shown by aligning the heads of the screws with the slotted holes in the side frame Make sure the a...

Страница 11: ...PORT 1 RCVR A IN to A20 mixer brick A W48 A21 test port 1 coupler to PORT 1 CPLR ARM W42 A25 port 1 step attenuator to PORT 1 SOURCE OUT W45 PORT 2 CPLR THRU to A22 test port 2 coupler W40 A19 SSLAM...

Страница 12: ...12 Installation Note N5230 90004 Figure 6 New Cable Installation...

Страница 13: ...scard it 3 Remove any adhesive remaining on the front panel 4 Remove the protective backing from the new front panel overlay item 5 Starting from either the left or right side loosely place the overla...

Страница 14: ...using a 5 16 in torque wrench set to 21 in lbs 2 Reconnect the ribbon cable item to the A3 front panel interface board 3 Slide the front panel over the test port connectors being careful to align the...

Страница 15: ...ont handles in the vertical position Do not place the analyzer on its front panel without the handles This will damage the front panel assemblies Refer to Figure 9 for this procedure 1 Slide the cover...

Страница 16: ...ble 3 In the Select Desired Option list click 1E1 Source Attenuators Click Enable 4 Click Yes in answer to the displayed question in the Restart Analyzer box 5 When the installation is complete click...

Страница 17: ...ound at Equipment Required for Post Upgrade Adjustments on page 6 Calibration The analyzer should now operate and phase lock over its entire frequency range If you experience difficulty with the basic...

Страница 18: ...18 Installation Note N5230 90004...

Отзывы: