Installation Note N5230-90004
17
Step 10. Perform Post-Upgrade Adjustments and Calibration
Adjustments
The following adjustments must be made due to the hardware changes of the analyzer.
• source calibration
• receiver calibration
These adjustments are described in the PNA service guide and in the PNA on-line HELP. A
list of equipment required to perform these adjustments can be found at
Required for Post-Upgrade Adjustments” on page 6
Calibration
The analyzer should now operate and phase lock over its entire frequency range.
If you experience difficulty with the basic functioning of the analyzer, contact Agilent. Refer to
“Contacting Agilent” on page 3
• Although the analyzer functions, its performance relative to its specifications has not been
verified.
• It is recommended that a full instrument calibration be performed using the PNA
performance test software.
• Refer to the analyzer’s service guide for information on the performance test software.
Содержание N5230-60102
Страница 12: ...12 Installation Note N5230 90004 Figure 6 New Cable Installation...
Страница 18: ...18 Installation Note N5230 90004...