
5-46
N9360A Multi UE Tester GSM Programming Manual
5
Programming Command Reference
Phase Error Test (Peak)
CONFigure:SEQuence:PHASe:PEAK <int>
CONFigure:SEQuence:PHASe:PEAK?
This command sets whether to execute the Peak Phase Error
test in the test sequence on the six measurement channels.
<int>
sets whether to execute this test on each Traffic Channel
by the total sum of the 6 bits as follows.
bit 0 (1): Testing on the TCH1
bit 1 (2): Testing on the TCH2
bit 2 (4): Testing on the TCH3
bit 3 (8): Testing on the TCH4
bit 4 (16): Testing on the TCH5
bit 5 (32): Testing on the TCH6
The value in the parentheses is decimal value for each bit. Refer
to
Setting and Querying the Registers
The set of each bit is
1
for Run and
0
for — (skip). At preset, this
is set to
63
.
This query command returns the set of Peak Phase Error test
with integer. The meaning of the return value is same as that of
the command parameter.
Содержание GS8210
Страница 1: ...Agilent Technologies Agilent N9360A Multi UE Tester GSM Programming Manual ...
Страница 12: ...xii N9360A Multi UE Tester GSM Programming Manual THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 18: ...xviii N9360A Multi UE Tester GSM Programming Manual THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 22: ...1 4 N9360A Multi UE Tester GSM Programming Manual 1 Legal Information THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 34: ...3 8 N9360A Multi UE Tester GSM Programming Manual 3 Preparing for Use THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 300: ...6 44 N9360A Multi UE Tester GSM Programming Manual 6 Programming Command Summary THIS PAGE IS INTENTIONALLY LEFT BLANK ...