54 Maintenance
4510012 - REV F – 220621
Wait for at least 20 minutes to allow the system to cool.
ATTENTION:
The Heating Element inside the Boiler Electrical Cabinet
must be given sufficient time to cool before continuing with the blowdown
procedure. Failure to wait for the temperature to decrease can result in
Heating Element failure.
Allow the Boiler pressure to decrease to 10 PSIG according to the Pressure Gauge.
Attach the Blowdown Hose (connected to a drain or a Blowdown Tank) to the Blowdown
Outlet).
WARNING:
The Blowdown Outlet may be hot. Use caution to avoid burns.
AFM-4510012-00025-01
Pressure
Gauge
Blowdown
Outlet
AFM-4510012-00039-01
Blowdown
Tank
0.75” (19,.1 cm)
Blowdown Hose
Содержание STC-WSN300-2M
Страница 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Страница 2: ...2 Abbreviations 4510012 REV F 220621 ...
Страница 8: ...8 Abbreviations 4510012 REV F 220621 ...
Страница 28: ...28 Introduction 4510012 REV F 220621 STC WSN600 2M GEN S Top View Front View Exit View Entry View ...
Страница 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Страница 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Страница 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Страница 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Страница 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Страница 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Страница 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...
Страница 84: ...84 Technical Support 4510012 REV F 220621 ...