40 Operation
4510012 - REV F – 220621
Turn the Boiler Control Power Switch off.
Slowly open the Blowdown Valve (parallel to the line) until the water drains from the
Boiler.
WARNING:
The water will be hot. Use caution to avoid burns.
If the flushed water is brownish in color, repeat this entire procedure three times or until
the flushed water is clear.
After completing all blowdown cycles, carefully remove the Blowdown Hose.
WARNING:
Connection and hose will be hot. Use caution to avoid burns.
Turn the Boiler Control Power Switch on.
Close the Boiler Cabinet Door.
Turn on the Conveyor.
Allow 20 minutes to reach operating temperature.
When ready to run product, verify that all four Manifold Access Doors are closed.
Blowdown
Valve
(Open)
Boiler Controller
Power Switch
(Off)
AFM-4510012-00036-01
AFM-4510012-00044-01
Содержание STC-WSN300-2M
Страница 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Страница 2: ...2 Abbreviations 4510012 REV F 220621 ...
Страница 8: ...8 Abbreviations 4510012 REV F 220621 ...
Страница 28: ...28 Introduction 4510012 REV F 220621 STC WSN600 2M GEN S Top View Front View Exit View Entry View ...
Страница 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Страница 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Страница 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Страница 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Страница 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Страница 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Страница 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...
Страница 84: ...84 Technical Support 4510012 REV F 220621 ...