62 Maintenance
4510012 - REV F – 220621
Inspect the Probes for any scale buildup.
Use a Scotch Brite pad to carefully and gently remove scale from each Probe.
ATTENTION:
Do not use hard objects or sharp force to break up the scale,
as this can damage the Probes and potentially void the warranty.
Remove all the old Plumber’s Tape from the threads of the Probes.
Put fresh Plumber’s Tape on the threads of the Probes.
Place the Probes back in the top of the Boiler Tank and use the Crescent Wrench to
gently tighten them snugly back into place.
Reconnect each Probe to the same wire to which it was previously attached.
NOTE:
If a Probe is connected to the wrong wire, the Boiler will not operate correctly.
For further details, see the Boiler Owner’s Guide (included).
Содержание STC-WSN300-2M
Страница 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Страница 2: ...2 Abbreviations 4510012 REV F 220621 ...
Страница 8: ...8 Abbreviations 4510012 REV F 220621 ...
Страница 28: ...28 Introduction 4510012 REV F 220621 STC WSN600 2M GEN S Top View Front View Exit View Entry View ...
Страница 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Страница 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Страница 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Страница 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Страница 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Страница 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Страница 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...
Страница 84: ...84 Technical Support 4510012 REV F 220621 ...