36 Installation and Setup
4510012 - REV F – 220621
Power Connection
The GEN-S requires either hard wiring or the installation of a power cord and plug.
Items Needed to Install Power Connection:
•
Licensed Electrician who works in accordance with all applicable national and local
electrical codes
•
Power Cord with 3-Phase, 480 VAC, 60 Amp, 50/60 Hz grounded plug
To Install Power Connection:
Have a Licensed Electrician connect a Power Cord that has a a 3-Phase, 480 VAC
50/60 Hz grounded plug (not included) to the Main Disconnect On/Off Switch Box.
Ensure that the Tunnel Main Power Switch is in the Off position before connecting to AC
power.
3-Phase Plug Connection
AFM-4510012-00034-01
Tunnel Main
Power Switch
Содержание STC-WSN300-2M
Страница 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Страница 2: ...2 Abbreviations 4510012 REV F 220621 ...
Страница 8: ...8 Abbreviations 4510012 REV F 220621 ...
Страница 28: ...28 Introduction 4510012 REV F 220621 STC WSN600 2M GEN S Top View Front View Exit View Entry View ...
Страница 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Страница 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Страница 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Страница 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Страница 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Страница 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Страница 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...
Страница 84: ...84 Technical Support 4510012 REV F 220621 ...