6.4
Function test, validation
Note
The STO function must be validated after the installation and after changes to the
installation.
This validation must be documented by the person performing commissioning. To
assist you with the commissioning, questions for risk minimisation are summarised
below in the form of sample checklists.
The checklists below are no substitute for safety training.
No guarantee can be provided for the completeness of the checklist.
No. Questions
Correct
Completed
1.
Were all operating conditions and interventions taken into
account?
Yes
No
2.
If the “3-step method” for risk minimisation was applied,
i. e. 1. Inherently safe design, 2. Technical and possibly
additional safety measures, 3. User information on the
residual risk?
Yes
No
3.
Were the hazards eliminated or the hazard risk reduced as
far as practically possible?
Yes
No
4.
Can it be guaranteed that the implemented measures will
not pose new hazards?
Yes
No
5.
Have the users been adequately informed and warned
about the residual risks?
Yes
No
6.
Can it be guaranteed that the operators’ working conditions
have not deteriorated due to the safety measures taken?
Yes
No
7.
Are the safety measures taken mutually compatible?
Yes
No
8.
Was adequate consideration given to the potential
consequences of using a machine designed for
commercial/industrial purposes in a non-
commercial/industrial area?
Yes
No
9.
Can it be guaranteed that the implemented measures will
not severely impair the machine’s ability to perform its
function?
Yes
No
Table 9:
Questions for validation in accordance with EN ISO 12100-1:2010 (example)