Attaching the cable cover
134 / 157
DLT-V83 Operating Instructions V2.00
15.3.1.
Attaching the cable cover (without integrated UPS)
Carefully mount all cables, see
Section15.3. Attaching cable grommets
Place the cable cover in the DLT-V83
housing slot.
Loosely tighten the 4 cylinder head screws
ISO 4762-M4x10-A2 of the cable cover.
Then fully tighten the screws with 3 Nm
torque crosswise.
Fig. 15.10: Screwing the cable cover into place
15.3.2.
Attaching the cable cover (with integrated UPS)
WARNING
Hazardous voltage, electric shock from contact with live parts.
Before connecting and disconnecting the cable cover with UPS, the DLT-V83 must be
currentless.
Shut down the DLT-V83 properly.
Disconnect the main power supply cable from the power supply.
If the DLoG Config configuration was set to also start the DLT-V83 without the <Power>
button and ignition, this setting must first be changed. Otherwise, the DLT-V83 will
automatically restart after a short pause.
Carefully mount all cables, see
Section15.3.
Hold the cable cover to the bottom edge of the
DLT-V83 as shown in the illustration.
The connecting cables of the UPS must point in
the direction of the connector panel.
Insert the plug with the detent lug, correctly
oriented, into the connector panel socket marked
UPS optional
.
Fig. 15.11: Cable cover with
integrated UPS battery
Place the cable cover into the housing groove of the DLT-V83.
Make sure that the battery cable is not jammed.
Loosely tighten the cylinder head screws ISO 4762-M4x10-A2 of the cable cover.
Then fully tighten the screws with 3 Nm torque crosswise.