ADVANTAGE ENGINEERING, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-0729 Fax: 317-881-1277
Service Department Fax: 317-885-8683
Email: [email protected]
C.
For installation of multiple units, a minimum of 8 feet is required between units placed
side by side. If placed end to end a minimum of 4 feet is required between units.
D.
Units in pits must have the top of the condenser level with or above the top of the pit and
a minimum of 8 feet is required between the unit and the pit walls.
E.
Lovers/fences must have a minimum of 80% free area and 4 feet minimum clearance
between the unit and the lovers/fence. Height of the louver/fence must not exceed the top
of the unit.
F.
If the chiller is installed in an environment where ambient temperatures could be under
35°F and/or if the unit operating set point will be 48°F or lower, a glycol and water
solution must be used instead of water. See section 8.1 for glycol ratio recommendations
and proper unit setting.
Typical Process Con-
nections shown on a
single zone unit.
Typical Process Con-
nections shown on a
dual zone unit.
Содержание OACS Series
Страница 2: ......
Страница 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Страница 44: ...Page 44 THIS PAGE INTENTIONALLY BLANK ...
Страница 72: ...Page 72 THIS PAGE INTENTIONALLY BLANK ...
Страница 85: ...END 2019 ADVANTAGE ENGINEERING INC RE 20190822 ...
Страница 86: ......