61200600L1-1A
© 2002 ADTRAN, Inc.
173
UNIT INSTALLATION USING THE AUTO-CONFIG FEATURE
Introduction
A
UTO
-C
ONFIG
allows the service provider to gain initial access to a newly installed IAD while in its factory
default state. This eliminates the need for a skilled technician on-site during installation, as it only requires
someone to make the network interface and power connections to the IAD. After accessing the unit, the
service provider remotely loads a configuration script. A fail-safe timer is then set and the configuration is
saved. Next, the service provider reprovisions the network to match the IAD's configuration and accesses
the unit. If the service provider can access the unit, the
A
UTO
-C
ONFIG
was successful, the unit is
operational, and the fail-safe timer should be cancelled. If access is not gained prior to the fail-safe timer
expiration, the fail-safe mechanism is invoked and the IAD returns to the default configuration.
This DLP details the steps involved in an IAD installation using the
A
UTO
-C
ONFIG
feature.
Prerequisite Procedures
The unit must be at factory default. If the unit is not a new unit, factory default the unit by one of the
following methods:
•
Select
S
YSTEM
U
TILITY
>T
ERMINAL
M
ODE
. At the > prompt, type
fac
. You will then see “Restore Factory
Defaults and Reset Unit? (press 'y').” Press the
y
key to confirm default. The unit then resets.
•
If connected to the
CRAFT
port, power reset the unit and then restore power to the unit while holding
down the
F
key. You will then be prompted to confirm the factory default.
Obtain the desired configuration file. The config file may be one of the following two formats:
•
A .cfg file which is loaded via TFTP. See DLP-009
, Saving the Current Configuration Using TFTP
•
A script obtained via the terminal mode. See DLP-013 (
Saving the Router's Configuration
section only).
The service provider's access network Layer 1 must be provisioned to map a single 64K
DS0 from the provider's network to DS0 24 on the customer's T1 circuit with matching
circuit parameters (ESF, B8ZS).
Содержание TOTAL ACCESS 600R
Страница 1: ...TOTAL ACCESS 600R System Manual 4200600L1 TDM Total Access 600R TDM 61200600L1 1A December 2002...
Страница 4: ...4 2002 ADTRAN Inc 61200600L1 1A Revision History This is the first issue of this manual...
Страница 16: ...Section 1 System Description Total Access 600R System Manual 16 2002 ADTRAN Inc 61200600L1 1A...
Страница 28: ...Section 2 Engineering Guidelines Total Access 600R System Manual 28 2002 ADTRAN Inc 61200600L1 1A...
Страница 30: ...Section 3 Network Turnup Procedure Total Access 600R System Manual 30 2002 ADTRAN Inc 61200600L1 1A...
Страница 34: ...Section 3 Network Turnup Procedure Total Access 600R System Manual 34 2002 ADTRAN Inc 61200600L1 1A...
Страница 128: ...Section 5 DLP Index Total Access 600R System Manual 128 2002 ADTRAN Inc 61200600L1 1A...
Страница 134: ...134 2002 ADTRAN Inc 61200600L1 1A Section 5 DLP 002 Total Access 600R System Manual...
Страница 138: ...138 2002 ADTRAN Inc 61200600L1 1A Section 5 DLP 003 Total Access 600R System Manual...
Страница 144: ...144 2002 ADTRAN Inc 61200600L1 1A Section 5 DLP 005 Total Access 600R System Manual...
Страница 152: ...152 2002 ADTRAN Inc 61200600L1 1A Section 5 DLP 007 Total Access 600R System Manual...
Страница 160: ...160 2002 ADTRAN Inc 61200600L1 1A Section 5 DLP 009 Total Access 600R System Manual...
Страница 180: ...180 2002 ADTRAN Inc 61200600L1 1A Section 5 DLP 015 Total Access 600R System Manual...
Страница 190: ...Section 6 ADTRAN Utilities Total Access 600R System Manual 190 2002 ADTRAN Inc 61200600L1 1A...
Страница 192: ...Section 7 MIB Total Access 600R System Manual 192 2002 ADTRAN Inc 61200600L1 1A...
Страница 196: ...Section 7 MIB Total Access 600R System Manual 196 2002 ADTRAN Inc 61200600L1 1A...