background image

 Document Q101, Revision W  

(Printout Uncontrolled) 

Page 8 of 23 

contracts to assure the capability and desire to meet the requirements. Any exceptions are communicated through Sales 
and Marketing, and negotiated to resolve or obtain the most favorable terms prior to contract execution; however, the 
CEO or appropriate Division General Manager is authorized to finalize contract negotiations with unresolved

 

issues if 

an impasse occurs that could jeopardize the pending business relationship. Records of each contract review are 
maintained by the appropriate organization. A copy of the executed contract is distributed to the cognizant departments 
for reference in performing the contract. (GEN03.1, SL15) 
 
The Sales and Marketing department communicates with our customers on product information, contracts, order 
handling, amendments, customer feedback, including customer complaints. Sales and Marketing maintains a 
documented customer notification process to ensure that customers are notified of any product problems or changes 
that may affect them. The ADTRAN/Customer Purchase Contract and/or the latest issued Telcordia technical 
publication GR-209-CORE are used as a guide for determining whether a product change warrants a customer 
notification. (SL02) 

 

Product repairs are coordinated by the Customer and Product Service group (CaPS). The warranty period and any 
special handling requirements are outlined in the repair warranty agreement or customer contract. (GEN02.3) 

 

ADTRAN maintains a dedicated Technical Service function whose responsibilities include: providing answers to 
technical and application questions, assisting in resolution of problems, and Marketing for product training. Product 
training is available for ADTRAN personnel and customers. 

 

Documented procedures have been developed and implemented defining processes for notifying the customer of 
reported problems, resolution of customer reported problems and providing the customer with feedback. Documented 
procedures are in place for assigning severity level to customer reported problems to ensure timely resolution. 
(GEN14.1, SL12, TS19.5) 

 

ADTRAN has a documented recall process to ensure the identification and recalling of products that are unfit to 
remain in service. (SL12) 

     

Design and Development 

 

Planning

 

 

As an integral part of the QMS, Engineering assures all product designs and specifications are reviewed, tested, 
verified and validated, when appropriate, prior to production. This is accomplished by guidance documents and control 
documents. ( EN02, EN07, EN10, EN11, and PQ01) 
 
Upon request, ADTRAN communicates, jointly agreed upon, design and development measurements with the 
customer.  

 

The organizational and technical interfaces between groups, in which design input is received, are defined in 
procedures outlining design engineering responsibilities. The design input information is captured by the designated 
responsible engineer and regularly reviewed during design review meetings.  (GEN04.4 and GEN05.5) 

 

The Engineering Manager plans projects, schedules and assigns activities. The Project Engineer interfaces with groups 
to assure requirements are transmitted so that the project progresses on schedule. Typical interfaces are with: Sales and 
Product Management for specification and customer requirements, Component Engineering for new part qualification, 
Purchasing and Component Engineering for Supplier Qualification, Technical Publications for document preparation, 
Material Control for planning material, Manufacturing Engineering for testability and manufacturability, Test 
Engineering for Test Plans, and Technical Support Services for end of life planning. (GEN04.4) 
 
Product schedules are maintained by the Engineering Planners and available on the ADTRAN internal network. 
Engineering Planners revise product schedules as the design and development progresses. (GEN04.4)  
 

Requirements Traceability

   

The responsible engineer ensures that the design meets all specifications and that all specifications are verified by 
verification testing. (EN10) 
 

Содержание Quality Management System (QMS)

Страница 1: ...terial described herein or for any other purpose without the written permission from ADTRAN This notice does not apply if expressly specified otherwise in a contract between ADTRAN and the second part...

Страница 2: ...DEFINITIONS Attachment I QUALITY POLICY STATEMENT Attachment II ADTRAN ORGANIZATIONAL CHART Attachment III QMS PROCESS MAP Attachment IV 4 LIFE CYCLE MODEL 1 0 REFERENCE DOCUMENTS ANSI ISO ASQ Q9001 2...

Страница 3: ...ectly or indirectly This system is subject to approval by our customers and by accredited organizations for certification under the ISO standards Elements of the Quality Management System described in...

Страница 4: ...ments GEN05 1 General ADTRAN s QMS documentation includes a ADTRAN s Quality Policy and Quality Objectives b The Quality Manual c General Work Instructions includes procedures required by TL9000 d Dep...

Страница 5: ...on Sales Marketing and Engineering have the primary responsibilities for determining and defining customer needs expectations and product requirements ADTRAN s management is committed to establishing...

Страница 6: ...tmental meetings Each manager is responsible for ensuring that responsibilities are defined and communicated to all associates Management Review The QMS at ADTRAN is in review on a continuous basis Ho...

Страница 7: ...then developed and maintained by the Engineering Planners to record and track product development GEN04 4 EN03 Life Cycle Model Attachment 4 ADTRAN maintains an integrated set of guidelines to cover t...

Страница 8: ...orted problems and providing the customer with feedback Documented procedures are in place for assigning severity level to customer reported problems to ensure timely resolution GEN14 1 SL12 TS19 5 AD...

Страница 9: ...nce with design and program objectives and to provide independent assessment of design methology EN02 EN11 and SL15 The responsible engineer documents design and development requirements in product sp...

Страница 10: ...erformance GEN0401 PG13 Purchasing The quality of finished products and ultimately the customer s satisfaction depends on procured materials and subassemblies Effective supplier selection procurement...

Страница 11: ...support shall be provided by trained ADTRAN or third party personnel in accordance with procedures provided by ADTRAN ADTRAN maintains documented results associated with the installation TS19 Patching...

Страница 12: ...or contamination Handling and storage practices are defined in ADTRAN s Stockroom procedure s A first In First out FIFO inventory control system is used Items with definitive shelf life are stipulate...

Страница 13: ...ification retesting of released product is accomplished by Quality Assurance Operations on a periodic basis Retesting is conducted in a more robust environment than the original acceptance test GEN10...

Страница 14: ...roduct and process data identifying potential problems their causes and determining the action required to eliminate the possibility of occurrence Preventative actions are documented utilizing ADTRAN...

Страница 15: ...quality management focused on setting quality objectives and specifying necessary operational processes and related resources to fulfill the quality objectives Quality Control Part of quality manageme...

Страница 16: ...in Old Telephone Service DOP Design for Operations PURCH PG Purchasing DTE Data Terminal Equipment Computer PQ Product Qualification DVT Design Verification Test QA Quality E1 European Version of T1 2...

Страница 17: ...TRAN team will provide our Customers with dependable cost effective on time products and services we expect our products to perform without interruption to stated specifications Thomas R Stanton Chief...

Страница 18: ......

Страница 19: ...Document Q101 Revision W Printout Uncontrolled Page 19 of 23 Organization of Key Executives Attachment II 05 01 09...

Страница 20: ......

Страница 21: ...ocesses Monitor Measure Processes Monitor Measure Product Monitor Measure Customer Satisfaction Measure Corporate Performance Evaluate Training Effectiveness Analyze Customer Satisfaction Data Analyze...

Страница 22: ...ements Fulfillment Contract Acquisition INTERNAL EXTERNAL SUPPORT ACTIVITIES e g HR TRAINING IT TECH SUPPORT CFO QUALITY Product Creation Management PROPOSAL CLOSURE SOFTWARE DEVELOPMENT PRODUCT QUALI...

Страница 23: ...quirements L 08 26 99 CO 4 1 4 1 3 4 3 4 6 4 4 6 5 Revised as result of NSAI audit dated 08 24 99 M 07 00 CO Revised as result of NSAI audit 07 00 N 04 24 02 SJ All Revised to meet TL9000 3 0 includes...

Отзывы: