Internal Audit

  

Quality Audit performs regularly scheduled internal audits to assure compliance with established processes. These 
audits are conducted by trained personnel who coordinate the audits with area managers. The results of the audits are 
documented; corrective actions are documented and evaluated through follow-up audits. These audit reports are 
forwarded to management for review. (GEN17.1) 
 

Processes

 

Corporate Quality Plans are developed to identify suitable methods of monitoring and measuring QMS processes. 
Corrective action is taken when unfavorable conditions exist. (GEN01.1) 

 

Operations Quality consistently monitors the production process, at appropriate points, through statistical process 
control methods. Corrective actions and preventive actions are implemented when necessary. (AM20-1) 
 

Product 

  

ADTRAN has implemented inspection and test points to ensure product requirements are met. Inspectors and Test 
Operators work from detailed work instructions. Records are maintained on all inspection and testing activities. 

 

ADTRAN performs functional and final testing to engineering released Acceptance Test Procedures (ATP). The 
continuous flow lines at ADTRAN utilize the concepts of all personnel as inspectors to visually detect workmanship 
defects prior to packaging. 
 
Inspection and test records are recorded by the performing function and maintained electronically on the ADTRAN 
internal network. Records include, but are not limited to: product identification, quantity of product inspected, 
inspection procedures followed, person performing the test and inspection, date of inspection and/or test, number, type, 
and severity of defects found. 

 

Product requalification / retesting of released product is accomplished by Quality Assurance / Operations on a periodic 
basis. “Retesting” is conducted in a more robust environment than the original acceptance test. ( GEN10.3 and RE01) 

 

All ADTRAN returned products are reworked, or repaired, and retested in accordance with the ADTRAN Engineering 
Acceptance Test Procedures. 
 
Software tests are conducted according to documented procedures and test plans. (EN10, PQ01) 

 

Control of Non-conforming Product 

  

Non-conforming material is reviewed and dispositioned by the Material Review Board (MRB). The chairperson of this 
board is the Quality representative. Operations Engineering, Manufacturing Services, and Purchasing are also board 
members. Other support personnel may be called upon as required. MRB dispositions are use-as-Is, Scrap, Repair, or 
Return to Vendor. Standard rework that meets specification requires no disposition. All rework or repair is subjected to 
inspection prior to continuing processing. Records of discrepancies are maintained on the ADTRAN internal network 
and reviewed for trends as input for corrective and preventive action. (GEN13.1,GEN13.2 GEN13.3 and AM4.13-1) 

 

Analysis of Data  

 

Data and information recorded in quality records are compiled and analyzed periodically to determine trends in the 
performance and effectiveness of the quality system and to identify opportunities for improvement  Some data utilized 
in this process comes from, but is not limited to, the following: 
Customer Satisfaction Surveys 

Field Performance Data 

 

Internal Audit Results 

 

 

Inspection Records 

 

Corrective and Preventive Action  Nonconforming Material 

Manufacturing and Test Records 

First Pass Yield and Delivery 

Supplier Performance 

 

 

Corporate Quality is responsible for coordinating these activities, and for reporting conclusions and trends to top 
management. This is usually done within the framework of management reports and reviews of the quality system. 

 

Содержание Quality Management System (QMS)

Страница 1: ...terial described herein or for any other purpose without the written permission from ADTRAN This notice does not apply if expressly specified otherwise in a contract between ADTRAN and the second part...

Страница 2: ...DEFINITIONS Attachment I QUALITY POLICY STATEMENT Attachment II ADTRAN ORGANIZATIONAL CHART Attachment III QMS PROCESS MAP Attachment IV 4 LIFE CYCLE MODEL 1 0 REFERENCE DOCUMENTS ANSI ISO ASQ Q9001 2...

Страница 3: ...ectly or indirectly This system is subject to approval by our customers and by accredited organizations for certification under the ISO standards Elements of the Quality Management System described in...

Страница 4: ...ments GEN05 1 General ADTRAN s QMS documentation includes a ADTRAN s Quality Policy and Quality Objectives b The Quality Manual c General Work Instructions includes procedures required by TL9000 d Dep...

Страница 5: ...on Sales Marketing and Engineering have the primary responsibilities for determining and defining customer needs expectations and product requirements ADTRAN s management is committed to establishing...

Страница 6: ...tmental meetings Each manager is responsible for ensuring that responsibilities are defined and communicated to all associates Management Review The QMS at ADTRAN is in review on a continuous basis Ho...

Страница 7: ...then developed and maintained by the Engineering Planners to record and track product development GEN04 4 EN03 Life Cycle Model Attachment 4 ADTRAN maintains an integrated set of guidelines to cover t...

Страница 8: ...orted problems and providing the customer with feedback Documented procedures are in place for assigning severity level to customer reported problems to ensure timely resolution GEN14 1 SL12 TS19 5 AD...

Страница 9: ...nce with design and program objectives and to provide independent assessment of design methology EN02 EN11 and SL15 The responsible engineer documents design and development requirements in product sp...

Страница 10: ...erformance GEN0401 PG13 Purchasing The quality of finished products and ultimately the customer s satisfaction depends on procured materials and subassemblies Effective supplier selection procurement...

Страница 11: ...support shall be provided by trained ADTRAN or third party personnel in accordance with procedures provided by ADTRAN ADTRAN maintains documented results associated with the installation TS19 Patching...

Страница 12: ...or contamination Handling and storage practices are defined in ADTRAN s Stockroom procedure s A first In First out FIFO inventory control system is used Items with definitive shelf life are stipulate...

Страница 13: ...ification retesting of released product is accomplished by Quality Assurance Operations on a periodic basis Retesting is conducted in a more robust environment than the original acceptance test GEN10...

Страница 14: ...roduct and process data identifying potential problems their causes and determining the action required to eliminate the possibility of occurrence Preventative actions are documented utilizing ADTRAN...

Страница 15: ...quality management focused on setting quality objectives and specifying necessary operational processes and related resources to fulfill the quality objectives Quality Control Part of quality manageme...

Страница 16: ...in Old Telephone Service DOP Design for Operations PURCH PG Purchasing DTE Data Terminal Equipment Computer PQ Product Qualification DVT Design Verification Test QA Quality E1 European Version of T1 2...

Страница 17: ...TRAN team will provide our Customers with dependable cost effective on time products and services we expect our products to perform without interruption to stated specifications Thomas R Stanton Chief...

Страница 18: ......

Страница 19: ...Document Q101 Revision W Printout Uncontrolled Page 19 of 23 Organization of Key Executives Attachment II 05 01 09...

Страница 20: ......

Страница 21: ...ocesses Monitor Measure Processes Monitor Measure Product Monitor Measure Customer Satisfaction Measure Corporate Performance Evaluate Training Effectiveness Analyze Customer Satisfaction Data Analyze...

Страница 22: ...ements Fulfillment Contract Acquisition INTERNAL EXTERNAL SUPPORT ACTIVITIES e g HR TRAINING IT TECH SUPPORT CFO QUALITY Product Creation Management PROPOSAL CLOSURE SOFTWARE DEVELOPMENT PRODUCT QUALI...

Страница 23: ...quirements L 08 26 99 CO 4 1 4 1 3 4 3 4 6 4 4 6 5 Revised as result of NSAI audit dated 08 24 99 M 07 00 CO Revised as result of NSAI audit 07 00 N 04 24 02 SJ All Revised to meet TL9000 3 0 includes...

Отзывы: