background image

 Document Q101, Revision W  

(Printout Uncontrolled) 

Page 23 of 23 

Q101 REVISION HISTORY 

Revision 

Date Revised 

Author 

Paragraph 

Description 

A 10/14/92 

GF  All 

Initial 

Release 

B 12/23/92 

GF  All 

Added 

and 

modified support document numbers and 

titles. 

12/04/93 

GF 

All 

Changes support document numbers. 

01/14/94 

GF 

4.1.2 

Add, “is the management representative” to 1

st

 line of 

3

rd

 par. 

 
 

  

4.1.3 

Added 

quarterly management review of quality data. 

 

 

 

4.19 

Added last par. To include installation and 
maintenance service. 

 

 

 

All 

Remove ref. To rev. from bottom of page. 

01/24/95 

GF 

2.4, 4.2, 4.3, 4.4.6, 

4.4.7, 4.14,  

Revised to meet requirements of 1994 revision of 
ANSI/ASQC Q9001. 

06/15/95 

GF 

4.2.1 

Added reference to customer and other organization 
contributions. 

G 03/11/96 

GF 

Attachment 

Attachment 2 

Updated the Quality Policy Statement and 
Organization chart. 

H 06/19/96 

HT  2.3 

Attachment 1 
Attachment 2 

Revised method of distribution for this manual. 
Updated the Quality Policy Statement and 
Organization Chart 

J 05/21/97 

CO 4.4.3 

Revised Quality Policy (Attachment 1) Revised Org. 
Chart (Attachment 2). Renumbered section 4.4. 

06/11/99 

CO 

All  

Revised to meet TL9000 requirements. 

08/26/99 

CO 

4.1, 4.1.3, 4.3, 4.6.4, 

4.6.5 

Revised as result of NSAI audit dated 08/24/99. 

07/00 

CO 

 

Revised as result of NSAI audit 07/00. 

N 04/24/02 

SJ  All 

Revised 

to meet TL9000 3.0 (includes 

ISO9000:2000). Also changed format. 

09/16/02 

SJ 

2.0 and Planning 

Add all elements of TL9000 to 2.0; add Top 
Management’s requirements for establishing quality 
objectives. Changed: operating procedures to work 
instruction pg. 6, Design to Responsible pg. 11. 
Added: business plans pg. 7, or designated individual 
Pg. 13, maintained on the pg. 14. 

R 06/12/03 

EB 

SJ 

Numerous 

 

Add reference to software.  Add definitions and 
Attachment 3 (Life Cycle Model). Remove 
Attachment 1 (Q. Policy) use Q. Policy statement in 
Manual. 

T 12/19.05 

SJ 

Signature 

Customer Related 

Processes 

Revised Officer signatures, revised org. chart, add Q 
Policy as Attachment 1 and remove policy from. 
Revised Customer Related Processes, Para 1, to 
adequately describe contract review.  

U 09/17/07 

SJ 

Numerous 

Revised 

Organizational Chart, added Compliance 

Engineering procedure reference, added verbiage on 
TL9000 4.0. 

V 11/12/08 

SJ 

Numerous 

Revised 

Organizational Chart, included patching  

05-05-09 

SJ 

Attachment I, II and 

III, revised reference 

to ISO9001:2008 

Changed date of last review on Attachment I and II , 
Revised Attachment III to reflect SQE move to Ops 
QA, revised reference to ISO9001:2008 

 

 

Содержание Quality Management System (QMS)

Страница 1: ...terial described herein or for any other purpose without the written permission from ADTRAN This notice does not apply if expressly specified otherwise in a contract between ADTRAN and the second part...

Страница 2: ...DEFINITIONS Attachment I QUALITY POLICY STATEMENT Attachment II ADTRAN ORGANIZATIONAL CHART Attachment III QMS PROCESS MAP Attachment IV 4 LIFE CYCLE MODEL 1 0 REFERENCE DOCUMENTS ANSI ISO ASQ Q9001 2...

Страница 3: ...ectly or indirectly This system is subject to approval by our customers and by accredited organizations for certification under the ISO standards Elements of the Quality Management System described in...

Страница 4: ...ments GEN05 1 General ADTRAN s QMS documentation includes a ADTRAN s Quality Policy and Quality Objectives b The Quality Manual c General Work Instructions includes procedures required by TL9000 d Dep...

Страница 5: ...on Sales Marketing and Engineering have the primary responsibilities for determining and defining customer needs expectations and product requirements ADTRAN s management is committed to establishing...

Страница 6: ...tmental meetings Each manager is responsible for ensuring that responsibilities are defined and communicated to all associates Management Review The QMS at ADTRAN is in review on a continuous basis Ho...

Страница 7: ...then developed and maintained by the Engineering Planners to record and track product development GEN04 4 EN03 Life Cycle Model Attachment 4 ADTRAN maintains an integrated set of guidelines to cover t...

Страница 8: ...orted problems and providing the customer with feedback Documented procedures are in place for assigning severity level to customer reported problems to ensure timely resolution GEN14 1 SL12 TS19 5 AD...

Страница 9: ...nce with design and program objectives and to provide independent assessment of design methology EN02 EN11 and SL15 The responsible engineer documents design and development requirements in product sp...

Страница 10: ...erformance GEN0401 PG13 Purchasing The quality of finished products and ultimately the customer s satisfaction depends on procured materials and subassemblies Effective supplier selection procurement...

Страница 11: ...support shall be provided by trained ADTRAN or third party personnel in accordance with procedures provided by ADTRAN ADTRAN maintains documented results associated with the installation TS19 Patching...

Страница 12: ...or contamination Handling and storage practices are defined in ADTRAN s Stockroom procedure s A first In First out FIFO inventory control system is used Items with definitive shelf life are stipulate...

Страница 13: ...ification retesting of released product is accomplished by Quality Assurance Operations on a periodic basis Retesting is conducted in a more robust environment than the original acceptance test GEN10...

Страница 14: ...roduct and process data identifying potential problems their causes and determining the action required to eliminate the possibility of occurrence Preventative actions are documented utilizing ADTRAN...

Страница 15: ...quality management focused on setting quality objectives and specifying necessary operational processes and related resources to fulfill the quality objectives Quality Control Part of quality manageme...

Страница 16: ...in Old Telephone Service DOP Design for Operations PURCH PG Purchasing DTE Data Terminal Equipment Computer PQ Product Qualification DVT Design Verification Test QA Quality E1 European Version of T1 2...

Страница 17: ...TRAN team will provide our Customers with dependable cost effective on time products and services we expect our products to perform without interruption to stated specifications Thomas R Stanton Chief...

Страница 18: ......

Страница 19: ...Document Q101 Revision W Printout Uncontrolled Page 19 of 23 Organization of Key Executives Attachment II 05 01 09...

Страница 20: ......

Страница 21: ...ocesses Monitor Measure Processes Monitor Measure Product Monitor Measure Customer Satisfaction Measure Corporate Performance Evaluate Training Effectiveness Analyze Customer Satisfaction Data Analyze...

Страница 22: ...ements Fulfillment Contract Acquisition INTERNAL EXTERNAL SUPPORT ACTIVITIES e g HR TRAINING IT TECH SUPPORT CFO QUALITY Product Creation Management PROPOSAL CLOSURE SOFTWARE DEVELOPMENT PRODUCT QUALI...

Страница 23: ...quirements L 08 26 99 CO 4 1 4 1 3 4 3 4 6 4 4 6 5 Revised as result of NSAI audit dated 08 24 99 M 07 00 CO Revised as result of NSAI audit 07 00 N 04 24 02 SJ All Revised to meet TL9000 3 0 includes...

Отзывы: