background image

 Document Q101, Revision W  

(Printout Uncontrolled) 

Page 11 of 23 

Engineering Change Order (ECO). Any deviation to this process requires an approved Process Deviation Notice. 
(AM4-9-1, EN05, GEN09.1, GEN09.2, GEN09.8) 

 

Manufacturing processes are monitored utilizing suitable process parameters and product characteristics. Operators 
and inspectors record the results of inspections and tests for analysis. (AM4.20-1, AM4.9-1, AM4.10-2, QA10.15) 

 

Support Program

   

ADTRAN Technical Services has complete cooperation and coordination from and with the Engineering Design 
department. Through the ADTRAN SPARTA system, customer issues are communicated with Design Engineering 
and design changes developed from problem resolutions. (GEN14.1) 

 

Service Resources

  

Complete resources for problem solving are available to the Technical Services function. Resources include a 
simulation lab, state of the art test and measurement equipment, and training on new/current products, technologies, 
and applications. 
 
During delivery and installation, ADTRAN strives to minimize interference with its customer’s normal operation and 
service.  
 

Emergency Service

  

ADTRAN’s Technical Services is available through a toll-free 800 number 24 hours every day, including holidays. 
When a problem cannot be resolved by telephone, engineers are dispatched to the problem site within the timeframe 
requested by the customer. Overnight emergency loaner units can be provided as part of ADTRAN’s service.  

 

Installation Plan 

  

ADTRAN maintains an installation process. When required by contract or ADTRAN management, installation and 
maintenance support shall be provided by trained ADTRAN or third party personnel in accordance with procedures 
provided by ADTRAN. ADTRAN maintains documented results associated with the installation

(TS19) 

 

Patching Procedures and Patch Documentation 

Documented procedures are maintained for guidance in determining when patching is required, applying and verifying 
the patch. When patching is required, the customer is provided with a statement of impact. (GEN4.4) 
 

Replication and Virus Protection

  

ADTRAN maintains a work instruction for replication of software products.  Following these procedures aids in virus 
detection and removal from the software deliverable. (EN06, EN11) 

 

Validation of Processes 

 

Manufacturing processes are monitored utilizing suitable process parameters and product characteristics. Operators 
and inspectors record the results of inspections and tests for analysis. 

 

Criteria for operator qualification(s) have been established and documented, along with an employee skill list that is 
utilized in determining work assignments. 

 

Each time a significant change to a production process is made, Process Engineering ensures a critical examination of 
the first unit(s) is performed. 

 

Identification and Traceability

   

ADTRAN controls and documents the configuration of all its products utilizing a defined process. Product 
development and changes are recorded and controlled to assure defined requirements are completed prior to further 
processing. (GEN08.1) 

 

Each assembly, subassembly, and component is assigned a unique number. Engineering creates Bills of Materials 
and/or drawings for all assemblies and subassemblies. Printed circuit boards are identified with ADTRAN part 
numbers. In addition, serial numbers are assigned to each unit in a work order. Serial number labels are attached 

Содержание Quality Management System (QMS)

Страница 1: ...terial described herein or for any other purpose without the written permission from ADTRAN This notice does not apply if expressly specified otherwise in a contract between ADTRAN and the second part...

Страница 2: ...DEFINITIONS Attachment I QUALITY POLICY STATEMENT Attachment II ADTRAN ORGANIZATIONAL CHART Attachment III QMS PROCESS MAP Attachment IV 4 LIFE CYCLE MODEL 1 0 REFERENCE DOCUMENTS ANSI ISO ASQ Q9001 2...

Страница 3: ...ectly or indirectly This system is subject to approval by our customers and by accredited organizations for certification under the ISO standards Elements of the Quality Management System described in...

Страница 4: ...ments GEN05 1 General ADTRAN s QMS documentation includes a ADTRAN s Quality Policy and Quality Objectives b The Quality Manual c General Work Instructions includes procedures required by TL9000 d Dep...

Страница 5: ...on Sales Marketing and Engineering have the primary responsibilities for determining and defining customer needs expectations and product requirements ADTRAN s management is committed to establishing...

Страница 6: ...tmental meetings Each manager is responsible for ensuring that responsibilities are defined and communicated to all associates Management Review The QMS at ADTRAN is in review on a continuous basis Ho...

Страница 7: ...then developed and maintained by the Engineering Planners to record and track product development GEN04 4 EN03 Life Cycle Model Attachment 4 ADTRAN maintains an integrated set of guidelines to cover t...

Страница 8: ...orted problems and providing the customer with feedback Documented procedures are in place for assigning severity level to customer reported problems to ensure timely resolution GEN14 1 SL12 TS19 5 AD...

Страница 9: ...nce with design and program objectives and to provide independent assessment of design methology EN02 EN11 and SL15 The responsible engineer documents design and development requirements in product sp...

Страница 10: ...erformance GEN0401 PG13 Purchasing The quality of finished products and ultimately the customer s satisfaction depends on procured materials and subassemblies Effective supplier selection procurement...

Страница 11: ...support shall be provided by trained ADTRAN or third party personnel in accordance with procedures provided by ADTRAN ADTRAN maintains documented results associated with the installation TS19 Patching...

Страница 12: ...or contamination Handling and storage practices are defined in ADTRAN s Stockroom procedure s A first In First out FIFO inventory control system is used Items with definitive shelf life are stipulate...

Страница 13: ...ification retesting of released product is accomplished by Quality Assurance Operations on a periodic basis Retesting is conducted in a more robust environment than the original acceptance test GEN10...

Страница 14: ...roduct and process data identifying potential problems their causes and determining the action required to eliminate the possibility of occurrence Preventative actions are documented utilizing ADTRAN...

Страница 15: ...quality management focused on setting quality objectives and specifying necessary operational processes and related resources to fulfill the quality objectives Quality Control Part of quality manageme...

Страница 16: ...in Old Telephone Service DOP Design for Operations PURCH PG Purchasing DTE Data Terminal Equipment Computer PQ Product Qualification DVT Design Verification Test QA Quality E1 European Version of T1 2...

Страница 17: ...TRAN team will provide our Customers with dependable cost effective on time products and services we expect our products to perform without interruption to stated specifications Thomas R Stanton Chief...

Страница 18: ......

Страница 19: ...Document Q101 Revision W Printout Uncontrolled Page 19 of 23 Organization of Key Executives Attachment II 05 01 09...

Страница 20: ......

Страница 21: ...ocesses Monitor Measure Processes Monitor Measure Product Monitor Measure Customer Satisfaction Measure Corporate Performance Evaluate Training Effectiveness Analyze Customer Satisfaction Data Analyze...

Страница 22: ...ements Fulfillment Contract Acquisition INTERNAL EXTERNAL SUPPORT ACTIVITIES e g HR TRAINING IT TECH SUPPORT CFO QUALITY Product Creation Management PROPOSAL CLOSURE SOFTWARE DEVELOPMENT PRODUCT QUALI...

Страница 23: ...quirements L 08 26 99 CO 4 1 4 1 3 4 3 4 6 4 4 6 5 Revised as result of NSAI audit dated 08 24 99 M 07 00 CO Revised as result of NSAI audit 07 00 N 04 24 02 SJ All Revised to meet TL9000 3 0 includes...

Отзывы: