background image

 Document Q101, Revision W  

(Printout Uncontrolled) 

Page 16 of 23 

 
ADTRAN ABBREVIATIONS 
 

ADTRAN 

Advanced TRANsmissions 

MRB 

Material Review Board 

AM 

ADTRAN Manufacturing 

MRP 

Material Requirements Planning 

ATP 

Acceptance Test Procedure 

MSDS 

Material Safety Data Sheet 

ATS Analytical 

Troubleshooting MT 

Manufacturing 

Test 

AWI 

ADTRAN Work Instruction 

NMR 

Non-conforming Material Report 

Baan 

ERP System 

MRD 

Marketing Requirements Document 

BOM 

Bill of Material 

NPI 

New Product Introduction 

CaPS 

Customer and Product Service NTF 

No 

Trouble 

Found 

CAR Corrective 

Action 

Request 

NWRK 

Network 

CARe 

Customer Action Request 

OCU DP 

Office Channel Unit Data Port 

CE 

Component Engineering 

OEM 

Original Equipment Manufacturer 

CI 

Component Inspection 

OPIT 

Operations Product Introduction Team 

CIT Continuous 

Improvement Team 

P/N 

Part Number 

CND 

Carrier Network Division 

PCB 

Printed Circuit Board 

CS 

Customer Support 

PCN 

Product Change Notice 

DCE 

Data Communications Equipment 

PDR 

Preliminary Design Review 

DDR 

Detailed Design Review 

PE 

Process Engineering 

DDS 

Digital Data System 

PO 

Purchase Order 

DO 

Document Control 

POTS 

Plain Old Telephone Service 

DOP 

Design for Operations 

PURCH / 
PG 

Purchasing 

DTE 

Data Terminal Equipment (Computer) 

PQ 

Product Qualification 

DVT Design 

Verification 

Test 

QA  Quality 

E1 

European Version of T1 (2.048MBPS) 

QMS 

Quality Management System 

ECO 

Engineering Change Order 

QuEST 

Quality Excellence for Suppliers of 
Telecommunications 

EF&I 

Engineer, Furnish & Install 

RE 

Reliability Engineering 

END Enterprise 

Network 

Division 

SIP  Single in-line Package (IC-integrated chip) 

EMS 

Environmental Management System 

SMT 

Surface Mount Technology 

ENGR /EN 

Engineering 

T1 

Carrier Line (leased from phone company @ 
1.544MBPS) 

ESD Electrostatic 

Discharge TE 

Test 

Engineering 

ESDS 

Electrostatic Discharge Sensitive 

TL9000 

Telecommunications Leadership 9000 

GEN 

General Work Instruction 

TS 

Technical Support 

HAZCOM Hazardous 

Communication TSU 

T1 

Service 

Unit 

HDSL 

High-Bit Rate Digital Subscriber Line 

UUT 

Unit Under Test 

ILEC 

Incumbent Local Exchange Carrier 

WAN 

Wide Area Network 

I/M Installation 

Maintenance 

 

 

ISDN Integrated 

Services Digital Network 

 

 

ISO International 

Standardization 

Organization 

 

 

ISU 

ISDN Service Unit 

 

 

LAN 

Local Area Network 

 

 

LIU Line 

Interface 

Unit 

 

 

I/M Installation 

Maintenance 

 

 

ICT In-Circuit 

Test 

 

 

MDA 

Manufacturing Defect Analyzer 

 

 

MFG Manufacturing 

 

 

MKTG / 
MK 

Marketing  

 

MPATT 

Monitored Product Audit Thermal Test   

 

Содержание Quality Management System (QMS)

Страница 1: ...terial described herein or for any other purpose without the written permission from ADTRAN This notice does not apply if expressly specified otherwise in a contract between ADTRAN and the second part...

Страница 2: ...DEFINITIONS Attachment I QUALITY POLICY STATEMENT Attachment II ADTRAN ORGANIZATIONAL CHART Attachment III QMS PROCESS MAP Attachment IV 4 LIFE CYCLE MODEL 1 0 REFERENCE DOCUMENTS ANSI ISO ASQ Q9001 2...

Страница 3: ...ectly or indirectly This system is subject to approval by our customers and by accredited organizations for certification under the ISO standards Elements of the Quality Management System described in...

Страница 4: ...ments GEN05 1 General ADTRAN s QMS documentation includes a ADTRAN s Quality Policy and Quality Objectives b The Quality Manual c General Work Instructions includes procedures required by TL9000 d Dep...

Страница 5: ...on Sales Marketing and Engineering have the primary responsibilities for determining and defining customer needs expectations and product requirements ADTRAN s management is committed to establishing...

Страница 6: ...tmental meetings Each manager is responsible for ensuring that responsibilities are defined and communicated to all associates Management Review The QMS at ADTRAN is in review on a continuous basis Ho...

Страница 7: ...then developed and maintained by the Engineering Planners to record and track product development GEN04 4 EN03 Life Cycle Model Attachment 4 ADTRAN maintains an integrated set of guidelines to cover t...

Страница 8: ...orted problems and providing the customer with feedback Documented procedures are in place for assigning severity level to customer reported problems to ensure timely resolution GEN14 1 SL12 TS19 5 AD...

Страница 9: ...nce with design and program objectives and to provide independent assessment of design methology EN02 EN11 and SL15 The responsible engineer documents design and development requirements in product sp...

Страница 10: ...erformance GEN0401 PG13 Purchasing The quality of finished products and ultimately the customer s satisfaction depends on procured materials and subassemblies Effective supplier selection procurement...

Страница 11: ...support shall be provided by trained ADTRAN or third party personnel in accordance with procedures provided by ADTRAN ADTRAN maintains documented results associated with the installation TS19 Patching...

Страница 12: ...or contamination Handling and storage practices are defined in ADTRAN s Stockroom procedure s A first In First out FIFO inventory control system is used Items with definitive shelf life are stipulate...

Страница 13: ...ification retesting of released product is accomplished by Quality Assurance Operations on a periodic basis Retesting is conducted in a more robust environment than the original acceptance test GEN10...

Страница 14: ...roduct and process data identifying potential problems their causes and determining the action required to eliminate the possibility of occurrence Preventative actions are documented utilizing ADTRAN...

Страница 15: ...quality management focused on setting quality objectives and specifying necessary operational processes and related resources to fulfill the quality objectives Quality Control Part of quality manageme...

Страница 16: ...in Old Telephone Service DOP Design for Operations PURCH PG Purchasing DTE Data Terminal Equipment Computer PQ Product Qualification DVT Design Verification Test QA Quality E1 European Version of T1 2...

Страница 17: ...TRAN team will provide our Customers with dependable cost effective on time products and services we expect our products to perform without interruption to stated specifications Thomas R Stanton Chief...

Страница 18: ......

Страница 19: ...Document Q101 Revision W Printout Uncontrolled Page 19 of 23 Organization of Key Executives Attachment II 05 01 09...

Страница 20: ......

Страница 21: ...ocesses Monitor Measure Processes Monitor Measure Product Monitor Measure Customer Satisfaction Measure Corporate Performance Evaluate Training Effectiveness Analyze Customer Satisfaction Data Analyze...

Страница 22: ...ements Fulfillment Contract Acquisition INTERNAL EXTERNAL SUPPORT ACTIVITIES e g HR TRAINING IT TECH SUPPORT CFO QUALITY Product Creation Management PROPOSAL CLOSURE SOFTWARE DEVELOPMENT PRODUCT QUALI...

Страница 23: ...quirements L 08 26 99 CO 4 1 4 1 3 4 3 4 6 4 4 6 5 Revised as result of NSAI audit dated 08 24 99 M 07 00 CO Revised as result of NSAI audit 07 00 N 04 24 02 SJ All Revised to meet TL9000 3 0 includes...

Отзывы: