background image

 Document Q101, Revision W  

(Printout Uncontrolled) 

Page 7 of 23 

Compliance engineering personnel are trained and supervised by experienced Compliance Department personnel while 
performing tests until appropriately qualified. (CEN01) 
 
 ADTRAN has an Employee Education Assistance Program to encourage and support further education at all levels. 
Training and Qualification opportunities are discussed during performance reviews. Employees may also recommend 
training needs relative to their immediate assignments. 

 

 
Associates are selected on the basis of education, training, and/or experience. All identified training needs or 
requirements are defined either in an employee’s performance review or job training packet. 

 

Infrastructure 

ADTRAN management is responsible for ensuring that buildings, workspaces, associated utilities, process equipment 
(both hardware and software), and supporting services (such as transport or communication) are sufficient to support 
product conformity. Security is provided in critical areas; restoration plans have been developed and are periodically 
assessed. (HRWI151, IT192, IT198, CBP01, IT Recovery Plan) 

 

Work Environment

  

ADTRAN management determines and manages the work environment to ensure product conformity. Areas used for 
handling, storage, and packaging of products shall be clean, safe, and organized. 

 

7.0

 

PRODUCT REALIZATION 
Planning of Product Realization

  

Product Management along with Design Engineering plan and develop the processes needed for product realization. 
Requirements considered are the quality objectives for the product, processes, documents, resources specific to the 
product, estimation of project factors, required verification, validation, monitoring, inspection, test activities, and 
criteria for product acceptance. Product schedules are then developed and maintained by the Engineering Planners to 
record and track product development. (GEN04.4, EN03) 
 

Life Cycle Model 

(Attachment 4) 

ADTRAN maintains an integrated set of guidelines to cover the entire product life cycle from conception through end 
of life. ADTRAN Work Instructions have been developed to control the planning of product sun setting. (GEN02.3, 
GEN04.4, GEN05.5, GEN09.3, GEN09.7, GEN09.9, SL13, TS19, TS19.1) 
 

New Product Introduction 

New Product Engineering establishes Operations Production Introduction Teams (OPIT) to aid in the introduction of 
new products and services per ADTRAN work instructions. ( GEN9.3, GEN9.7, GEN09.9, AM4.9-34) 

 

Disaster Recovery 

All documentation, quality records and other necessary documents are stored on the internal network servers. 
ADTRAN maintains a documented Information Technology (IT) Recovery Plan. This plan is designed to provide 
immediate response and subsequent recovery from any unplanned computing services interruption, such as loss of 
utility services, building evacuation or catastrophic event such as a major fire

. (CBP01, IT Recovery Plan)

 

 

 

 

End of Life Planning 

 

A documented procedure is maintained for the discontinuance, sun-setting of existing products. This procedure ensures 
that manufacturing and service are notified prior to sun-setting and that actions are implemented to ensure support of 
the product through warranty or contractual agreement. (

GEN04.9

, GEN05.12, SL13) 

 

Configuration Management  

ADTRAN controls and documents the configuration of all its products utilizing a defined process. Product 
development and changes are recorded and controlled to assure defined requirements are completed prior to further 
processing. (GEN4.1, GEN04.5, GEN05.4, GEN05.5, GEN05.12, EN05, EN06) 

 

Customer Related Processes 

 

The Sales and Marketing department along with Engineering determine and review the customer and product 
requirements. All affected departments within ADTRAN review each non-standard contract and amendments to 

Содержание Quality Management System (QMS)

Страница 1: ...terial described herein or for any other purpose without the written permission from ADTRAN This notice does not apply if expressly specified otherwise in a contract between ADTRAN and the second part...

Страница 2: ...DEFINITIONS Attachment I QUALITY POLICY STATEMENT Attachment II ADTRAN ORGANIZATIONAL CHART Attachment III QMS PROCESS MAP Attachment IV 4 LIFE CYCLE MODEL 1 0 REFERENCE DOCUMENTS ANSI ISO ASQ Q9001 2...

Страница 3: ...ectly or indirectly This system is subject to approval by our customers and by accredited organizations for certification under the ISO standards Elements of the Quality Management System described in...

Страница 4: ...ments GEN05 1 General ADTRAN s QMS documentation includes a ADTRAN s Quality Policy and Quality Objectives b The Quality Manual c General Work Instructions includes procedures required by TL9000 d Dep...

Страница 5: ...on Sales Marketing and Engineering have the primary responsibilities for determining and defining customer needs expectations and product requirements ADTRAN s management is committed to establishing...

Страница 6: ...tmental meetings Each manager is responsible for ensuring that responsibilities are defined and communicated to all associates Management Review The QMS at ADTRAN is in review on a continuous basis Ho...

Страница 7: ...then developed and maintained by the Engineering Planners to record and track product development GEN04 4 EN03 Life Cycle Model Attachment 4 ADTRAN maintains an integrated set of guidelines to cover t...

Страница 8: ...orted problems and providing the customer with feedback Documented procedures are in place for assigning severity level to customer reported problems to ensure timely resolution GEN14 1 SL12 TS19 5 AD...

Страница 9: ...nce with design and program objectives and to provide independent assessment of design methology EN02 EN11 and SL15 The responsible engineer documents design and development requirements in product sp...

Страница 10: ...erformance GEN0401 PG13 Purchasing The quality of finished products and ultimately the customer s satisfaction depends on procured materials and subassemblies Effective supplier selection procurement...

Страница 11: ...support shall be provided by trained ADTRAN or third party personnel in accordance with procedures provided by ADTRAN ADTRAN maintains documented results associated with the installation TS19 Patching...

Страница 12: ...or contamination Handling and storage practices are defined in ADTRAN s Stockroom procedure s A first In First out FIFO inventory control system is used Items with definitive shelf life are stipulate...

Страница 13: ...ification retesting of released product is accomplished by Quality Assurance Operations on a periodic basis Retesting is conducted in a more robust environment than the original acceptance test GEN10...

Страница 14: ...roduct and process data identifying potential problems their causes and determining the action required to eliminate the possibility of occurrence Preventative actions are documented utilizing ADTRAN...

Страница 15: ...quality management focused on setting quality objectives and specifying necessary operational processes and related resources to fulfill the quality objectives Quality Control Part of quality manageme...

Страница 16: ...in Old Telephone Service DOP Design for Operations PURCH PG Purchasing DTE Data Terminal Equipment Computer PQ Product Qualification DVT Design Verification Test QA Quality E1 European Version of T1 2...

Страница 17: ...TRAN team will provide our Customers with dependable cost effective on time products and services we expect our products to perform without interruption to stated specifications Thomas R Stanton Chief...

Страница 18: ......

Страница 19: ...Document Q101 Revision W Printout Uncontrolled Page 19 of 23 Organization of Key Executives Attachment II 05 01 09...

Страница 20: ......

Страница 21: ...ocesses Monitor Measure Processes Monitor Measure Product Monitor Measure Customer Satisfaction Measure Corporate Performance Evaluate Training Effectiveness Analyze Customer Satisfaction Data Analyze...

Страница 22: ...ements Fulfillment Contract Acquisition INTERNAL EXTERNAL SUPPORT ACTIVITIES e g HR TRAINING IT TECH SUPPORT CFO QUALITY Product Creation Management PROPOSAL CLOSURE SOFTWARE DEVELOPMENT PRODUCT QUALI...

Страница 23: ...quirements L 08 26 99 CO 4 1 4 1 3 4 3 4 6 4 4 6 5 Revised as result of NSAI audit dated 08 24 99 M 07 00 CO Revised as result of NSAI audit 07 00 N 04 24 02 SJ All Revised to meet TL9000 3 0 includes...

Отзывы: