background image

 Document Q101, Revision W  

(Printout Uncontrolled) 

Page 21 of 23 

 

Top Management

Training

Sales/Marketing

Engineering

Purchasing

Operations

Establish Policy, 

Objectives, 

Management Review

Control Quality 

System 

Documentation

Establish/Improve 

Quality System

Administer 

Quality System

Resource 

Management

Provide Resources

Qualify / train 

W orkforce

Identify Product 

Requirements

Review Product 

Requirements

Plan/Implement 

Purchase 

Controls

Plan /Implement 

Operation 

Controls

Evaluate 

Suppliers

Plan / Implement 

Quality Controls

Manage Customer 

Communications

Qualify/Select 

Suppliers

Establish Maintain 

Prod. I.D.

Verify 

Purchased 

Product

Plan/Implement 

Design Control

Review Purchase 

Documents

Control Customer 

Property

Maintain 

Product 

Traceability

Preserve Product

Validate 

Special 

Processes

Monitor/Measure 

Processes

Monitor / 
Measure 

Product

Monitor / Measure 

Customer 

Satisfaction

Measure Corporate 

Performance

Evaluate Training 

Effectiveness

Analyze Customer 

Satisfaction Data

Analyze Product 

Performance 

Data

Analyze Supplier 

Performance 

Data

Evaluate 

Operations 

Control

Analyze 

Product / 

Nonconformit

y  and 

Supplier 

Quality Data

Initiate Corrective Actions (to prevent recurrence of problems identified) and Preventive Actions (to prevent occurrence of potential problems) and Provide Summary Data & Trend Analysis 

Results to Top Management (for Review and Quality Management System I

Measurement, 

Analysis & 

Improvement

Product Realization

Analyze Process / Product Quality 

Data, Nonconformity & Internal 

Audit Results

Management 

Responsibility

Control Nonconformity

(Figure 3)    ADTRAN QUALITY MANAGEMENT SYSTEM,  05-01-09

Global Quality

Ops QA

Control 

Monitoring / 

Measuring 

Devices

Monitor / 
Measure 

Product

Conduct 

Internal Quality 

Audits

Design

Yes

No

Attachment III 

05-01-09 

Содержание Quality Management System (QMS)

Страница 1: ...terial described herein or for any other purpose without the written permission from ADTRAN This notice does not apply if expressly specified otherwise in a contract between ADTRAN and the second part...

Страница 2: ...DEFINITIONS Attachment I QUALITY POLICY STATEMENT Attachment II ADTRAN ORGANIZATIONAL CHART Attachment III QMS PROCESS MAP Attachment IV 4 LIFE CYCLE MODEL 1 0 REFERENCE DOCUMENTS ANSI ISO ASQ Q9001 2...

Страница 3: ...ectly or indirectly This system is subject to approval by our customers and by accredited organizations for certification under the ISO standards Elements of the Quality Management System described in...

Страница 4: ...ments GEN05 1 General ADTRAN s QMS documentation includes a ADTRAN s Quality Policy and Quality Objectives b The Quality Manual c General Work Instructions includes procedures required by TL9000 d Dep...

Страница 5: ...on Sales Marketing and Engineering have the primary responsibilities for determining and defining customer needs expectations and product requirements ADTRAN s management is committed to establishing...

Страница 6: ...tmental meetings Each manager is responsible for ensuring that responsibilities are defined and communicated to all associates Management Review The QMS at ADTRAN is in review on a continuous basis Ho...

Страница 7: ...then developed and maintained by the Engineering Planners to record and track product development GEN04 4 EN03 Life Cycle Model Attachment 4 ADTRAN maintains an integrated set of guidelines to cover t...

Страница 8: ...orted problems and providing the customer with feedback Documented procedures are in place for assigning severity level to customer reported problems to ensure timely resolution GEN14 1 SL12 TS19 5 AD...

Страница 9: ...nce with design and program objectives and to provide independent assessment of design methology EN02 EN11 and SL15 The responsible engineer documents design and development requirements in product sp...

Страница 10: ...erformance GEN0401 PG13 Purchasing The quality of finished products and ultimately the customer s satisfaction depends on procured materials and subassemblies Effective supplier selection procurement...

Страница 11: ...support shall be provided by trained ADTRAN or third party personnel in accordance with procedures provided by ADTRAN ADTRAN maintains documented results associated with the installation TS19 Patching...

Страница 12: ...or contamination Handling and storage practices are defined in ADTRAN s Stockroom procedure s A first In First out FIFO inventory control system is used Items with definitive shelf life are stipulate...

Страница 13: ...ification retesting of released product is accomplished by Quality Assurance Operations on a periodic basis Retesting is conducted in a more robust environment than the original acceptance test GEN10...

Страница 14: ...roduct and process data identifying potential problems their causes and determining the action required to eliminate the possibility of occurrence Preventative actions are documented utilizing ADTRAN...

Страница 15: ...quality management focused on setting quality objectives and specifying necessary operational processes and related resources to fulfill the quality objectives Quality Control Part of quality manageme...

Страница 16: ...in Old Telephone Service DOP Design for Operations PURCH PG Purchasing DTE Data Terminal Equipment Computer PQ Product Qualification DVT Design Verification Test QA Quality E1 European Version of T1 2...

Страница 17: ...TRAN team will provide our Customers with dependable cost effective on time products and services we expect our products to perform without interruption to stated specifications Thomas R Stanton Chief...

Страница 18: ......

Страница 19: ...Document Q101 Revision W Printout Uncontrolled Page 19 of 23 Organization of Key Executives Attachment II 05 01 09...

Страница 20: ......

Страница 21: ...ocesses Monitor Measure Processes Monitor Measure Product Monitor Measure Customer Satisfaction Measure Corporate Performance Evaluate Training Effectiveness Analyze Customer Satisfaction Data Analyze...

Страница 22: ...ements Fulfillment Contract Acquisition INTERNAL EXTERNAL SUPPORT ACTIVITIES e g HR TRAINING IT TECH SUPPORT CFO QUALITY Product Creation Management PROPOSAL CLOSURE SOFTWARE DEVELOPMENT PRODUCT QUALI...

Страница 23: ...quirements L 08 26 99 CO 4 1 4 1 3 4 3 4 6 4 4 6 5 Revised as result of NSAI audit dated 08 24 99 M 07 00 CO Revised as result of NSAI audit 07 00 N 04 24 02 SJ All Revised to meet TL9000 3 0 includes...

Отзывы: