ADLY MOTO
ENGINE REMOVE AND INSTALLATION
INSTALLATION
x
Mounting the engine and tie-up fixed nuts with standard locking torque.
Locking torque
Κ
Fixed M10 nuts on bracket
Κ
4.0 kg-m
x
Place a floor jack under the engine. Again, be sure to protect the engine from the jack head with
a block of wood. Lift the engine to align the mounting bolt holes, then install the brackets, bolts
and nuts.
x
The remainder of installation is the reverse of the removal steps, with the following additions:
a) Use new gaskets at all exhaust pipe connections.
b) Adjust the clutch cable and the throttle cable.
c) Fill the engine with oil. Run the engine and check for leaks.
x
Finish mounting the engine; be sure to check the throttle cable tolerance.
Use reversed procedure to setup the parts that has been removed.
NOTE
Κ
ϡ
ʳ
All cables and wiring has to be set into correct position
6-2