
EVO S
, Installation, Commisioning and Servicing Instructions
27
EN
Figure 8 - Dimensioning recommendations
4.3.3. Connection to a B23P chimney
B23P type connection:
Air from the installation premises, gas evacuation through the roof via a
pressurised duct.
IMPORTANT:
The use of the "Chimney Adaptor" accessory is mandatory to connect
a EVO S boiler to a B23P chimney duct. The table below shows the
accessories available for each boiler type.
IMPORTANT:
Check that the boiler installation premises have high and low
ventilation, that it conforms to current regulations and that it is not
obstructed.
The A dimension indicates the height
of the chimney adapter when fully
inserted relative to the
upper panel of
the boiler.
A
Содержание EVO S 100
Страница 2: ......
Страница 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Страница 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Страница 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Страница 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Страница 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Страница 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Страница 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Страница 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...