
EVO S
, Installation, Commisioning and Servicing Instructions
EN
140
12.1.5.2. Fixing
1. Remove the two left hand side cables, 14-way ribbon cable and 2 core
cable
2. Remove the mounting screws from the control box and keep them
3. Fit the Ribbon cable into the OCI345, check the orientation
4. Remove the 2-way RAST5 connector from the OCI345
5. Secure the OCI345 to the control box using the two mounting screws
6. Strip the outer sheath of the 2-core cable
7. Strip the two inner conductors and crimp on ferrules
8. Secure the cables:
DB Brown
MB White
9. Plug the RAST5 connector back into the OCI345, note that the connector
is polarised and so the screw heads face towards the control box
12.1.5.3. Wiring
For cascade operation, connect each LPB bus connection in daisy chain:
DB to DB, MB to MB, etc.
For an external module refer to the installation documentation provided with
the specific option kit.
12.1.5.4.
Configuration cascade
cascade master
Cascade slave
12.1.5.5.
Configuration Non- cascade
Line No.
Parameter
Settings
12.1.6. UIN 235791 modbus interface
Line No.
Parameter
Settings
12.2. External kits
Line No.
Parameter
Settings
Содержание EVO S 100
Страница 2: ......
Страница 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Страница 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Страница 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Страница 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Страница 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Страница 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Страница 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Страница 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...