
EVO S
, Installation, Commisioning and Servicing Instructions
EN
146
12.2.5.4. Sensor cable size
Cross-sectional area
Maximum length
0.25 mm
2
20 m
0.5 mm
2
40 m
1.0 mm
2
80 m
1.5 mm
2
120 m
12.2.5.5. Fixing
Follow the fixing instructions as detailed on the box.
12.2.5.6. Wiring
At the Boiler end make the connections as required.
Signal
Boiler
GND
19
BX3
20
GND
21
BX2
22
GND
25
B3/B38
26
For an external module refer to the installation documentation provided with
the specific option kit.
12.2.5.7.
Configuration
Line No. Parameter
Settings
5931
Sensor input BX2
As required
5932
Sensor input BX3
As required
DHW sensor B3/B38
5730
DHW sensor
As required:
DHW sensor B3/Thermostat/
DHW outlet sensor B38
5131
Comparison temperature transfer
As required:
DHW sensor B3/DHW outlet
sensor B38
Cascade - Common flow sensor (on cascade master)
6117
Central setp compensation
20°C/1..100°C
6630
Cascade master
Always
Содержание EVO S 100
Страница 2: ......
Страница 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Страница 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Страница 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Страница 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Страница 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Страница 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Страница 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Страница 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...