
EVO S
, Installation, Commisioning and Servicing Instructions
EN
24
4.2.
Removing / installing the front panel
Pull the bottom of the panel forwards to
release.
Lift the front panel to remove it and free the 2
lugs.
Perform the operation in reverse to reassemble.
Figure 7 - Removing the front cover
4.3. Flue connection
Covered by Gas Safe reference.
You must comply with the regulatory texts and rules of the art that apply in
the country where the boiler will be installed, i.e.:
The exhaust evacuation ducts must be made of a material that is resistant
to the condensates that can form during the boiler's operation, and
their correct fit must be checked.
These materials must also be capable of
supporting flue gas temperatures up to 120°C.
Do not use non-compliant, modified, or broken ducts.
One exhaust temperature sensor guarantees the protection of the type
B and C combustion product evacuation ducts.
EVO S boilers are approved to be connected to:
•
a B23 or B23P open flue
•
a C13 or C33 room seuled flues
IMPORTANT:
The boiler must not be made to support the exhaust duct’s weight.
Содержание EVO S 100
Страница 2: ......
Страница 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Страница 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Страница 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Страница 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Страница 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Страница 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Страница 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Страница 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...