
EVO S
, Installation, Commisioning and Servicing Instructions
EN
22
4. INSTALLATION
The boiler is delivered with:
- A plan for helping fix the boiler to the wall.
- Two mounting hooks.
- A 4 bar (models below 70 kW) or 6 bar (models above 80 kW) safety valve.
- A plastic funnel that is adapted to the safety valve.
- A siphon and a flexible hose for evacuating condensates.
- An information plate for the 40 to 120 kW models switching to propane gas.
- A gas adapter for the 70 to 120 kW models switching to propane gas.
4.1. Installing the boiler
IMPORTANT:
The boiler must not bear the weight of the accessories and connections
(hydraulics, gas, exhaust system, etc.).
WARNING :
The use of the fixing hooks supplied with the product or our supports
is mandatory.
Hooks (provided)
Figure 5 - Mounting with hooks (supplied)
Содержание EVO S 100
Страница 2: ......
Страница 13: ... EVO S Installation Commisioning and Servicing Instructions 13 EN ...
Страница 44: ...EVO S Installation Commisioning and Servicing Instructions EN 44 Figure 19 Wiring diagram ...
Страница 45: ...EVO S Installation Commisioning and Servicing Instructions 45 EN ...
Страница 149: ...EVO S Installation Commisioning and Servicing Instructions 149 EN ...
Страница 150: ...EVO S Installation Commisioning and Servicing Instructions EN 150 ...
Страница 151: ...EVO S Installation Commisioning and Servicing Instructions 151 EN ...
Страница 152: ...EVO S Installation Commisioning and Servicing Instructions EN 152 ...
Страница 153: ...EVO S Installation Commisioning and Servicing Instructions 153 EN ...