12
monitor.
5.2.3 Installation mode of AIL150-4/AIL150-8 /AIL160-6insulation fault locator
AIL150-4/AIL150-8/AIL160-6 adopts the installation method of the DIN-rail, and the fixation
mode is the clip buckle type, as shown in the following figure:
Each branch of IT system must pass through each transformer of the AIL150/AIL160 and then
connects to the load, the AIL150/AIL160 should be near the output terminal of each branch during
the installation to facilitate the wiring.
5.2.5 Installation mode of AID150 centralized alarm and display device
1) If you choose to embed the wall for installation, the installation diagram is as follows:
1.Product shape
2.Size of wall
openings
3.Insert the shell
into the wall
5.Fixed LCD board
and Shell
4.Connect to the
LCD board through
the terminal
Attention:
As our products
are constantly
updated, this
drawing is for
reference only
until it has been
confirmed by the
relevant
personnel.
Acrel
Run
Comm Error Alarm
AID150
TEST
MENU
During the decoration, firstly the AID150 shell should be embedded in the wall to be fixed and be
close to the knockouts of the pipeline, so that the wires (two power cords + a two-core shielded
twisted pair) can be drawn to the front cover, and then fix the cover on the shell with screws.
2)If you choose to install AID150 by opening the cabinet door, the cut-out size is as follows:
35mm DIN- rail
Clip buckel