138
DO Operation:
Standardizing
XL40 and 60 meters
Automatic standardization at two points—% Saturation
For this standardization, the 0% saturation must be the first point followed by 100% saturation.
The meter will accept readings below 5% saturation for 0% saturation standardization and
between 30 and 200% saturation for 100% saturation (at 760 mm Hg).
1. Touch
Standardize
on the DO measure screen to access the standardize screen.
2. If the screen says “
Not standardized
” proceed to step 4.
3. Touch
Clear
if you need to delete the previous standardization values.
4. Insert DO probe into a bottle containing 0% saturation solution.
5. Allow probe to stabilize for 30 minutes, constantly stirring the solution.
6. The screen will flash a 0% beaker icon. When the reading is stable,
STABLE
appears on
the screen. Touch
Confirm
to standardize. The meter will then return to the DO measure
screen.
7. Touch
Standardize
on the DO measure screen to access the standardize screen.
8. Insert DO probe into a BOD bottle filled with 1 inch of water to provide a 100% relative
humidity environment.
9. Allow probe to stabilize for 30 minutes.
10. The screen will flash a 100% beaker icon next to the 0% beaker icon. When the reading
is stable,
STABLE
appears on the screen. Touch
Confirm
to standardize. The meter will
then return to the DO measure screen.
Once meter is calibrated DO Measure screen shows the standards, the time/date of last
standardization and AUTO standard recognition.
Содержание XL 20
Страница 1: ......
Страница 138: ...127 Ion Operation Known Addition Method XL25 50 and 60 meters...
Страница 140: ...129 Ion Operation Known Subtraction Method XL25 50 and 60 meters...
Страница 142: ...131 Ion Operation Analate Addition Method XL25 50 and 60 meters...
Страница 144: ...133 Ion Operation Analate Subtraction Method XL25 50 and 60 meters...