1 Operation Points and Startup
1-1
1
Operation Points and Startup
This chapter outlines the operation for the following operation points.
The startup procedure from power-up to staring of operation is also explained.
Operation points for UF200R/UF190R:
1)
EMO (emergency stop) and POWER switches
2)
Loader unit
3)
Display/touch panel unit
4) Head
stage
5) Storage media (USB terminal)
6) Internal
printer