7
Load+
To the po) of Load
Load-
To the negative(-) of Load
BTS
Battery Temperature Sensor
Ground
■
Recommended Installation Sequence:
Connect Load
→
Battery
→
Solar Cell
■
If there is no load connected
Connect Battery
→
Solar Cell
■
Make sure the BTS wire is installed and fixed to the contact (CN11).
■
Make sure the Battery and load are removed before entering into setting mode.
Mode
Description
Remarks
Load Mode
Output without connecting with
battery.
Output voltage via LCD panel is
required to be set..
Charging Mode
Output connecting battery or
connecting both battery and load.
Output voltage via LCD panel
can be fixed or auto set.
Caution!
1. Make sure all cables are connected properly without short-circuiting.
2. There is 100A fuse inside the (BAT+).
3. Disconnect the Battery if there is no solar cell and load connected or if the solar cell is
sheltered for a long while.
4. Do not overload the charger! Please refer to specification sheet to use the charger properly.
5. Make sure the voltage and capacity of the Battery is set correctly. Re battery setting,
please refer to 2.1 Operation
6. Make sure the bat. temperature compensation wire is installed and fixed where the battery
is installed, not in the internal of the battery. Make sure the adhesive use is easy to
conduct heat, so as to make sure the accuracy of the temperature compensation of the unit.
1.3 Accessories
1.Battery Compensation sire(BST) × 1
2.Connecting terminal to the solar panel(phi4-male) × 1