ABEM Terrameter LS
14
Figure 10. The Start View
In the middle of the
View
there are two rows with shortcuts to other
Views
.
•
Using the shortcuts
―
Press <Up> or <Down> to highlight one of the two rows
―
Press <Ok> to change to the
View
For the first of these rows there are two possible situations:
- If the active
Project
does not have any
Task
then the text “< Task is missing. Please create >” will be shown.
Pressing <Ok> will in this case change
View
to the
“Project/Task List”
of the
active
Project
. This
View
is explained in chapter 3.6.2
- Otherwise if the active
Project
does have a
Task
then the name of the active
Task
will be shown. See Figure 10 for an example.
Pressing <Ok> will in this case change to the
“Measure/Progress” View
of this
Task
. This
View
is explained in chapter 6.9.1
For the second row the same thing will happen as a press on the <Browse> button, the
View
will change to the
“Project/Project List” View
. Chapter 3.6.1 has an explanation
of this
View
.
Содержание Terrameter LS
Страница 1: ...Instruction Manual Terrameter LS ABEM Product Number 33 3000 95 ABEM 20120109 based on release 1 9 ...
Страница 2: ...ABEM Terrameter LS ...
Страница 10: ...ABEM Terrameter LS v ...
Страница 76: ...ABEM Terrameter LS 66 Here are some examples of the text area information for different measurement errors ...