ABEM Terrameter LS
93
11.3
Induced Polarisation (IP)
In the case of time domain IP measuring one positive and one negative current pulse
is usually employed. It is then necessary to measure the background levels before and
after the measuring cycle, and use that for removing drift during the measuring cycle.
Failure to do so can lead to magnitude higher measurement errors in the measured
resistivity data. (Figure 107)
Period
Current
Voltage
Measuring intervals
Figure 107.
IP measuring cycle timing definitions
Содержание Terrameter LS
Страница 1: ...Instruction Manual Terrameter LS ABEM Product Number 33 3000 95 ABEM 20120109 based on release 1 9 ...
Страница 2: ...ABEM Terrameter LS ...
Страница 10: ...ABEM Terrameter LS v ...
Страница 76: ...ABEM Terrameter LS 66 Here are some examples of the text area information for different measurement errors ...