Limit counter L4UFCNT.............................................................185
Completing the test.............................................................. 186
ETPMMTR.................................................................................186
Verifying the settings............................................................ 186
Completing the test.............................................................. 188
Station communication................................................................... 188
Multiple command and transmit MULTICMDRCV /
MULTICMDSND........................................................................188
Remote communication..................................................................188
Binary signal transfer BinSignReceive, BinSignTransm............188
Basic IED functions........................................................................ 189
Parameter setting group handling SETGRPS........................... 189
Exit test mode.................................................................................190
Section 11 Primary injection testing............................................... 191
Transformer Voltage Control ATCC............................................... 191
Load drop compensation function, LDC.................................... 191
Voltage control of Parallel Transformers................................... 193
Minimum Circulating Current (MCC) method............................ 193
Master Follower (MF) method................................................... 195
Completing the test....................................................................196
Section 12 Commissioning and maintenance of the fault
clearing system............................................................ 197
Preparation...........................................................................198
Recording............................................................................. 199
Secondary injection.............................................................. 199
Alarm test............................................................................. 199
Self supervision check..........................................................199
Trip circuit check.................................................................. 199
Measurement of service currents......................................... 200
Table of contents
8
Bay control REC670 2.1 IEC
Commissioning manual
Содержание Relion REC670
Страница 1: ...Relion 670 series Bay control REC670 2 1 IEC Commissioning manual...
Страница 2: ......
Страница 15: ...Restoring 201 Section 13 Glossary 203 Table of contents Bay control REC670 2 1 IEC 9 Commissioning manual...
Страница 16: ...10...
Страница 30: ...24...
Страница 34: ...28...
Страница 62: ...56...
Страница 66: ...60...
Страница 88: ...82...
Страница 208: ...202...
Страница 217: ...211...