circulating current will be half of the current detected at T1. The setting of the
parameter
Comp
then might need to be increased a little. At least one tap changer
step difference between the different transformers should be allowed in order to
avoid the tap changers to operate too often. If the allowed difference is, for
example, two steps, the tap changer shall be stepped up three steps when setting
the parameter
Comp
.
10. Set the
Comp
parameter for T2 and T3 in the same manner as for T1. According
to the described procedure when the tap changer of one transformer is two steps
above the others, it shall automatically step down. When there are only two
transformers in the group either shall one step down or the other step up
depending on the voltage level at the ATCC.
11.1.4
Master Follower (MF) method
The Master Follower method requires a Master to be nominated in a parallel group. It
is responsible for measuring secondary bus voltage and executing commands to raise
and lower tap changers, which are repeated by Follower transformers in the group.
1.
Confirm the voltage blocking levels
OVPartBK
and
UVPpartBK
in
Main
menu/Settings/General settings/Control/
TransformerVoltageControl(ATCC,90)/TR8ATCC:x/Voltage/
Umax,Umin
.
2.
Check that
MFMode
is set to
Follow Tap
or
Follow Cmd
in
Main menu/
Settings/General settings/Control/TransformerVoltageControl(ATCC,
90)/TR8ATCC:x/MFMode
.
If this setting is
Follow Tap
, all Follower transformers shall match the actual tap
setting of the Master, while
Follow Cmd
requires that Follower transformers
follow the RAISE and LOWER commands executed by the Master.
3.
Confirm the maximum difference in tap positions for parallel transformers. The
number of taps is determined by the setting in the Parameter Setting tool under
Main menu/Settings/Setting group N/Control/
TransformerVoltageControl(ATCC,90)/TR8ATCC:x/ParCtrl/
MFPosDiffLim
4.
Connect all transformers in the parallel group to the same busbar on both the
primary and secondary sides.
5.
Set the control mode to
Manual
for each transformer in the parallel control group
6.
Open the test display for Transformer Voltage Control on the LHMI in
Main
menu/Test/Function status/Control/TransformerVoltageControl (ATCC,
90)
.
1MRK 511 360-UEN A
Section 11
Primary injection testing
Bay control REC670 2.1 IEC
195
Commissioning manual
Содержание Relion REC670
Страница 1: ...Relion 670 series Bay control REC670 2 1 IEC Commissioning manual...
Страница 2: ......
Страница 15: ...Restoring 201 Section 13 Glossary 203 Table of contents Bay control REC670 2 1 IEC 9 Commissioning manual...
Страница 16: ...10...
Страница 30: ...24...
Страница 34: ...28...
Страница 62: ...56...
Страница 66: ...60...
Страница 88: ...82...
Страница 208: ...202...
Страница 217: ...211...