10.12.3.1
Verifying the settings
1. Connect the test set for the injection of a three-phase current to the appropriate
current terminals of the IED.
2. If current need to be injected for a particular test, it should be done in the phase
selected by the
PhSel
parameter.
3. Follow the sequence for positioning the auxiliary contacts before testing:
POSCLOSE
0
1
0
POSOPEN
0
0
1
4. Test of CB contact travel time
4.1. Test the set timing defined by
OpenTimeCorr
,
CloseTimeCorr
,
tTrOpenAlm
and
tTrCloseAlm
.
4.2. Change the status of the auxiliary contacts such that travel time to open
TTRVOP
and travel time to close
TTRVCL
exceed the respective set values
(
tTrOpenAlm
and
tTrCloseAlm
). The measured travel time for opening and
closing is shown on
TTRVOP
and
TTRVCL
respectively.
4.3. Check that
TRVTOPAL
and
TRVTCLAL
are activated.
5. Test of CB status
5.1. Test the set current level defined by
AccStopCurr
.
5.2. Check the
CLOSEPOS
output by changing the
POSOPEN
to
0
and
POSCLOSE
to
1
.
5.3. Check the
OPENPOS
output by changing the
POSOPEN
to
1
and
POSCLOSE
to
0
and also inject the current in the selected phase slightly
lower and higher than
AccStopCurr
set value. Only for a current lower than
set
AccStopCurr
should activate the output
POSOPEN
.
5.4. Check the circuit breaker is in
INVDPOS
if auxiliary contacts read same
value or CB is open and inject the current in selected phase more than
AccStopCurr
set value.
6. Test of remaining life of CB
6.1. Test the set timing defined by
RatedOperCurr
,
RatedFltCurr
,
OperNoRated
,
OperNoFault
,
DirCoef
,
CBLifeAlmLevel
.
6.2. Vary the phase current in the selected phase from below rated operated
current,
RatedOperCurr
to above rated fault current,
RatedFltCurr
of a
breaker.
6.3. The remaining life of CB output
CBLIFEPH
is estimated when the CB is
changed from closed to open position. Check that the output
CBLIFEPH
is
decreased with a value that corresponds to the injected current.
6.4.
CBLIFEAL
is activated as soon as
CBLIFEPH
is below the set
CBLifeAlmLevel
value.
7. Test of accumulated energy
Section 10
1MRK 511 360-UEN A
Testing functionality by secondary injection
182
Bay control REC670 2.1 IEC
Commissioning manual
Содержание Relion REC670
Страница 1: ...Relion 670 series Bay control REC670 2 1 IEC Commissioning manual...
Страница 2: ......
Страница 15: ...Restoring 201 Section 13 Glossary 203 Table of contents Bay control REC670 2 1 IEC 9 Commissioning manual...
Страница 16: ...10...
Страница 30: ...24...
Страница 34: ...28...
Страница 62: ...56...
Страница 66: ...60...
Страница 88: ...82...
Страница 208: ...202...
Страница 217: ...211...