![ABB ProKiln GAC400 Скачать руководство пользователя страница 86](http://html1.mh-extra.com/html/abb/prokiln-gac400/prokiln-gac400_operating-instruction_4693066086.webp)
86
ProKiln GAC400
PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
… 11 Maintenance
… Equipment layout plan
Illustration inspection port - center nozzle air blaster
Equipment
Reference
Designation
1
Inspection and clean-out entrance
1.3.
1 x O-ring for inspection port
1.3.1
Swagelok straight connector, 3/4", SS-1210-1-12W-BT
1.3.2
Swagelok tee, welded, 3/4"
1.3.3
Dacapo DN20 union, DJ10343000
1.3.4
Dacapo DN20 union, DN30252725
1.3.5
Straight angle 90°, 3/4", welded
1.3.6
Swagelok straight connector, 1", SS-1610-6-16W
1.3.7
Center pipe tap, 4x20
1.3.8
Center pipe cover plug, 36x62
1.3.9
Dacapo sealing, Viton, DIN 11851