PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
… 8 Commissioning
… Activation of the probe gas sampling system
Switching on the probe gas sampling system
1. Turn the safety switch probe
1
to position OFF to prevent
any probe movement on the front of the retractor system
control cabinet
1
Safety switch probe
Figure 47: Retractor control cabinet
2. Turn on the general power supply
2
and the UPS power
supply
3
for the probe gas sampling system on the side of
the control cabinet
2
General power supply
3
UPS power supply
Figure 48: Control cabinet (retractor system electrical cabinet)
3. Turn on the power supply for the water system
4
on the
side of the side of the water system electrical cabinet.
4
Water system power switch
Figure 49: Water system electrical cabinet
4. Flip all the fuse switches one by one in the control cabinet
and in the water system electrical cabinet.
5. Wait for controller and the frequency converter to boot.
6. Wait for the heaters in the probe H1, sample hose H2 and the
hose connection point H3 to reach their operating
temperatures.
1
2
3
4