![ABB ProKiln GAC400 Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/abb/prokiln-gac400/prokiln-gac400_operating-instruction_4693066044.webp)
44
ProKiln GAC400
PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
… 6 Installation
Installing the probe
How to lift the probe
1
Crane shackle point 1000 kg
2
Transport legs – Remove after installation
Figure 38: How to lift the probe
Lifting instructions
Use only the included crane shackles for lifting.
Weight
1200 kg
Note
•
Figure 38
is shown without flange shutter – to be installed on kiln wall prior to retractor/probe.
•
Figure 38
is shown with transport legs front and back (To be removed after usage/install).
F00711
2
2
2
2
1
1
1
1
1