![ABB ProKiln GAC400 Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/abb/prokiln-gac400/prokiln-gac400_operating-instruction_4693066046.webp)
46
ProKiln GAC400
PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
… 6 Installation
… Installing the probe
How to install the probe
Probe view from top
Figure 40: Standard 3 m probe, shown with insertion flange / pipe *
1
Typical install area
2
No install in bottom 50 % of kiln
3
No install in top 25 % of kiln
4
Platform floor
5
Typical platform length 6500 mm [256 in]
6
Backend install flange (floor or roof based)
7
ASME B16.5 Slip On Welding Flange - Kiln center lineass 150 8
″ *
8
Install flange / pipe to be welded to kiln foot wall
9
Installation flange / pipe 8
″ *
0
Min. kiln center line height: 1200 mm [47 in]
k
Max. kiln center line height: 1600 mm [63 in]
l
Typical Platform width: 2000 mm [79 in]
m
Kiln center line
n
Kiln sealing
o
Angle to kiln center line: 45° (-0° +30°)
p
Insertion pipe 8
″
Sch40 (length to be cut flush with kiln inlet lining
) *
q
Kiln foot wall
r
Example of distance to kiln sealing -should be as short as possible (here:
1000 mm [39 in])
*
Customer supply
F00712
5052 [199 in]
1
3
p
6
o
4
r
q
2
7
8
9
j
k
m
n
4
l
5