![ABB ProKiln GAC400 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/abb/prokiln-gac400/prokiln-gac400_operating-instruction_4693066025.webp)
ProKiln GAC400
PROBE GAS SAMPLING SYSTEM | OI/GAC400-EN REV. A
25
Cooling panel
The probe cooling panel serves to cool the water supply. The
cooling panel contains the air-to-water heat exchanger. The
cooling panel can be installed directly connected to the water
panel or it can be installed within maximum 5 meters to the
water panel.
Figure 10: Cooling Panel
Pos. Component
Function
1
Water inlet from probe
Cools down hot water from probe
2
Water outlet to tank
Provides cool water to tank/probe
3
Electrical fan
Air-to-water heat exchanger
4
Emergency stop
Turns off fan
Transformer – power supply (optional)
The system is not supplied with a customized transformer. If a
transformer is required to meet the probe gas sampling system
power specifications it should be acquired locally in order to
meet local standards and legislation.
Compressed-air system
The compressed-air is used for probe filter blow-back and air
blaster cleaning of the centre and periphery nozzles in the tip of
the probe.
The compressed air system also serves to operate the optional
flange shutter.
Requirements
The compressed-air must meet the following minimum
requirements:
Category
Requirement
Dew point
0°C (for temperatures below 0°C make sure that the
compressed-air supply cannot freeze)
Pressure
6-8 bar
Consumption
1 m
3
/h
Quality
Free of dirt and oil / water droplets
Compressed-air tank
A dedicated air tank of minimum 250 l is required with minimum
a 1
″
connection for air supply and 1
″
connections to the
retraction unit. The air tank must be placed as close to the
retractor unit as possible, taking site conditions and potential
heat radiation into account.
The air tank must be equipped with oil and water cleaning
devices on the supply side of the tank. The compressed-air
supplied to the tank must be based on above specifications. No
oil and water cleaning devices must be placed between the
compressed-air tank and the compressed-air connection points
on the retractor unit as this will reduce the air delivered for
probe cleaning by the air blasters.
A locally acquired air tank should be installed in order to meet
local standards and legislation.
4
2
1
4
3
3