Refitting the robot signal exchange proxy
Note/Illustration
Action
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see
1
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
The unit is sensitive to ESD. Before
handling the unit read the safety inform-
ation in section
2
xx2000000419
Screws: Torx pan head screw M4x8 (4 pcs)
Fit the robot signal exchange proxy and
secure the screws.
3
Insert the cable ties into the locking
holes.
4
Refitting the main computer assembly to the cabinet
Note/Illustration
Action
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see
1
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
When handling the computer outside of
the controller, use the wrist strap button
located on the side of the computer.
2
xx2100000318
Continues on next page
134
Product manual - OmniCore V250XT
3HAC073447-001 Revision: B
© Copyright 2020-2022 ABB. All rights reserved.
3 Installation and commissioning
3.7.5 Installing the fieldbus master
Continued
Содержание OmniCore V250XT
Страница 1: ...ROBOTICS Product manual OmniCore V250XT ...
Страница 2: ...Trace back information Workspace 22A version a10 Checked in 2022 03 02 Skribenta version 5 4 005 ...
Страница 34: ...This page is intentionally left blank ...
Страница 50: ...This page is intentionally left blank ...
Страница 174: ...This page is intentionally left blank ...
Страница 410: ...This page is intentionally left blank ...
Страница 418: ...This page is intentionally left blank ...
Страница 454: ......
Страница 455: ......