Note
Action
xx2200000813
Pull the cam roller unit out.
4
xx2200000815
Refitting the 90 cam roller unit
Use this procedure to refit the cam roller unit.
Refitting the 90 cam roller unit
Note
Action
Use Shell Retinax LX2.
Fully lubricate and clean the cam roller unit
before install it to the carriage.
Tip
During the operation, watch the seals at
the ball bearing block: when you see the
grease pouring out, you have applied
enough grease.
1
Continues on next page
Product manual - IRT 710
241
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.2.2 Replacing the cam roller units
Continued
Содержание IRT 710
Страница 1: ...ROBOTICS Product manual IRT 710 ...
Страница 2: ...Trace back information Workspace Systems version a40 Checked in 2023 10 18 Skribenta version 5 5 019 ...
Страница 14: ...This page is intentionally left blank ...
Страница 58: ...This page is intentionally left blank ...
Страница 84: ...This page is intentionally left blank ...
Страница 360: ...This page is intentionally left blank ...
Страница 364: ...This page is intentionally left blank ...
Страница 378: ...This page is intentionally left blank ...
Страница 380: ...This page is intentionally left blank ...
Страница 383: ......